Lexicographic goal programming approach for a short-term mining planning problem

被引:133
作者
Martins, Aldrin Gustavo [1 ,2 ]
Freitas Souza, Marcone Jamilson [3 ]
机构
[1] Fed Inst Minas Gerais, Dept Min, Congonhas, Brazil
[2] Themat Network Mat Engn REDEMAT, Grad Program Mat Engn, Ouro Preto, Brazil
[3] Univ Fed Ouro Preto, Dept Comp, Ouro Preto, Brazil
关键词
Short-term planning; open-pit mining; grade and size ranges; mixed-integer linear programming; lexicographic goal programming; PIT; ALGORITHM; DESIGN;
D O I
10.1080/0305215X.2021.2004135
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article addresses a short-term mining planning problem. There are four objectives to be minimized: the deviations in grades and ore proportion in particle size ranges of the plant goals, the deviation in the waste mass to achieve the stripping rate, and the number of truck trips between mining fronts and discharges. The problem was solved through the lexicographical goal programming (LGP) method, which generates solutions that can guarantee a more comprehensive analysis of the decision-making process. The LGP method was tested by using several scenarios of a Brazilian mining company. These scenarios differ in the number of excavators and the tolerances concerning meeting the plants' ore grades. In the results, the impact on the values of the other objectives is analysed of varying the number of excavators and the tolerances in the plants' grade targets.
引用
收藏
页码:329 / 343
页数:15
相关论文
共 27 条
[1]   Development of a scenario-based robust model for the optimal truck-shovel allocation in open-pit mining [J].
Bakhtavar, E. ;
Mahmoudi, H. .
COMPUTERS & OPERATIONS RESEARCH, 2020, 115
[2]   Short-term scheduling of an open-pit mine with multiple objectives [J].
Blom, Michelle ;
Pearce, Adrian R. ;
Stuckey, Peter J. .
ENGINEERING OPTIMIZATION, 2017, 49 (05) :777-795
[3]   A Decomposition-Based Algorithm for the Scheduling of Open-Pit Networks Over Multiple Time Periods [J].
Blom, Michelle L. ;
Pearce, Adrian R. ;
Stuckey, Peter J. .
MANAGEMENT SCIENCE, 2016, 62 (10) :3059-3084
[4]   A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines [J].
Blom, Michelle L. ;
Burt, Christina N. ;
Pearce, Adrian R. ;
Stuckey, Peter J. .
INFORMS JOURNAL ON COMPUTING, 2014, 26 (04) :658-676
[5]   Attitudes toward elderly workers and perceptions of integrated age management practices [J].
Blome, Mikael Widell ;
Borell, Jonas ;
Hakansson, Carita ;
Nilsson, Kerstin .
INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2020, 26 (01) :112-120
[6]  
Chanda E.K. C., 1995, International Journal of Mining, Reclamation and Environment, V9, P203, DOI DOI 10.1080/09208119508964748
[7]   Production phase and ultimate pit limit design under commodity price uncertainty [J].
Chatterjee, Snehamoy ;
Sethi, Manas Ranjan ;
Asad, Mohammad Waqar Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 248 (02) :658-667
[8]  
Coelho V. N., 2012, ELECT NOTES DISCRETE, V39, p233 , DOI DOI 10.1016/J.ENDM.2012.10.031
[9]  
Costa F.P., 2004, REV BRASIL MINERAL, V231, P26
[10]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197