共 99 条
[1]
Analysis and manufacturing of above knee prosthesis socket by using revo fit solution
[J].
INTERNATIONAL CONFERENCE ON MATERIALS ENGINEERING AND SCIENCE,
2018, 454
[2]
Abbas SM., 2018, International Journal of Mechanical Engineering and Technology (IJMET), V9, P560
[4]
[Anonymous], 2004, GUID TRAIN PERS DEV
[5]
Arelekatti VNM, 2015, INT C REHAB ROBOT, P350, DOI 10.1109/ICORR.2015.7281224
[8]
Bhatt Shaurya, 2021, Advances in Engineering Design. Select Proceedings of ICOIED 2020. Lecture Notes in Mechanical Engineering (LNME), P3, DOI 10.1007/978-981-33-4018-3_1
[9]
Brandt M, 2017, WOODH PUB SER ELECT, P1
[10]
Casolo F., 2017, INT J APPL ENG RES