Flow shop scheduling of hybrid make-to-stock and make-to-order in a distributed precast concrete production system

被引:11
作者
Chen, Chen [1 ,3 ]
Han, Jinchi [1 ]
Liu, Ziwen [1 ,2 ,3 ]
Tiong, Robert Lee Kong [1 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, 50 Nanyang Ave, Singapore, Singapore
[2] Singapore Univ Social Sci, Sch Sci & Technol, 463 Clementi Rd, Singapore, Singapore
[3] Singapore Univ Social Sci, Sch Sci & Technol, Room 6-93, 463 Clementi Rd, Singapore 599494, Singapore
来源
CLEANER LOGISTICS AND SUPPLY CHAIN | 2023年 / 7卷
关键词
Prefabrication; Distributed manufacturing; Hybrid MTO and MTS; Flow shop scheduling; Meta-heuristics; MULTIPLE PRODUCTION; MODEL; OPTIMIZATION; LINES;
D O I
10.1016/j.clscn.2023.100106
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Prefabrication is not only economically optimal but also environmentally sustainable; hence, it is the future of construction. Furthermore, mass customization is the future of prefabrication. In the mass customization era, the production paradigm in precast concrete (PC) factories will inevitably shift toward a blend of make-to-order (MTO) and make-to-stock (MTS) from the current MTO dominant model. Because PC factories have more motivation to fulfill MTO orders to secure profit, a hierarchical scheduling mechanism of MTO first and MTS second seems reasonable. Meanwhile, an emerging trend of expanding factories overseas is observed in the PC industry, especially in land-scarce countries like Singapore. Given additional resources, the new multiple-factory production network leads to relatively relaxed MTO due dates, which makes the proposed hierarchical scheduling mechanism more sensible. However, finding an optimal production plan for hybrid MTO and MTS on multiple production lines is not easy. There is an assignment problem in addition to the scheduling problem. Both the assignment problem and the scheduling problem are in the class of combinatorial optimization problems (COPs). Given that the use of meta-heuristics for solving complex COPs is a rapidly growing research topic, this paper employs meta-heuristic methods to solve the two problems simultaneously. Comparisons between the genetic algorithm and the whale optimization algorithm are made. Through the computational evaluation of a test case, the performance and effectiveness of the proposed methods are verified.
引用
收藏
页数:11
相关论文
共 23 条
[1]   A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction [J].
Anvari, B. ;
Angeloudis, P. ;
Ochieng, W. Y. .
AUTOMATION IN CONSTRUCTION, 2016, 71 :226-241
[2]   Flowshop scheduling model for bespoke precast concrete production planning [J].
Benjaoran, Vacharapoom ;
Dawood, Nashwan ;
Hobbs, Brian .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) :93-105
[3]   Production scheduling for precast plants using a flow shop sequencing model [J].
Chan, WT ;
Hu, H .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (03) :165-174
[4]   An application of genetic algorithms to precast production scheduling [J].
Chan, WT ;
Hu, H .
COMPUTERS & STRUCTURES, 2001, 79 (17) :1605-1616
[5]   A simulation model for eliciting scheduling knowledge: An application to the precast manufacturing process [J].
Dawood, NN .
ADVANCES IN ENGINEERING SOFTWARE, 1996, 25 (2-3) :215-223
[7]  
GOLDBERG DE, 1989, PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON GENETIC ALGORITHMS, P70
[8]   OPTIMIZATION OF CONTROL PARAMETERS FOR GENETIC ALGORITHMS [J].
GREFENSTETTE, JJ .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1986, 16 (01) :122-128
[9]  
Jiang W., 2020, MATH PROBL ENG
[10]   Flow shop optimization of hybrid make-to-order and make-to-stock in precast concrete component production [J].
Jiang, Wen ;
Wu, Lanjun .
JOURNAL OF CLEANER PRODUCTION, 2021, 297