Development of delay mitigation measures in construction projects: a combined interpretative structural modeling and MICMAC analysis approach

被引:13
作者
Arantes, Amilcar [1 ]
Ferreira, Luis Miguel D. F. [2 ]
机构
[1] Univ Lisbon, Civil Engn Architecture & Georesources Dept, CERIS, Inst Super Tecn, Lisbon, Portugal
[2] Univ Coimbra, Dept Mech Engn, CEMMPRE, Coimbra, Portugal
关键词
Construction industry; delay causes; interpretive structural modelling; MICMAC analysis; mitigation measures; project management; SUPPLY-CHAIN COMPETITIVENESS; MANAGEMENT-PRACTICES; INFORMATION-SYSTEMS; LITERATURE-REVIEWS; PERFORMANCE; INNOVATION; AGILITY; IMPACT; INTEGRATION; COMPETENCE;
D O I
10.1080/09537287.2022.2163934
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction delays are recurrent worldwide, regardless of the type of work, and can result in severe impacts, such as time and cost overruns and conflicts. This work aims to present a methodology to develop mitigation measures for the causes of Delays in Construction Projects (DCPs). Prior works have explored strategies to develop these measures but systematically failed to consider that the interrelationships among causes affect the significance of the impact of each cause. The methodology proposed combines the Interpretative Structural Modelling (ISM) and Matrix Cross Impact Matrix Multiplication (MICMAC) analyses approaches and is grounded on the opinions of construction experts collected during Focus Group Interviews (FGI). First, the critical causes of DCPs are identified. Second, the ISM model is built, representing the interrelationships between the causes and their hierarchy. Third, the MICMAC analysis is performed, revealing the strengths of the relationships among the influencing causes. Fourth, mitigation measures are developed to address the root causes identified in the previous steps, but they are designed to target and mitigate other causes, given their hierarchical relationships, driving power, and levels of dependence. Applying this methodology to the Portuguese context revealed 16 critical causes, which were then hierarchized into six levels of influence. Inadequate bidding and contract award processes and deficient communication between parties were deemed root causes, and 23 measures were put forward to mitigate DCPs. Therefore, this study contributes to the body of knowledge by designing an innovative and practitioner-wise methodology to develop mitigation measures in relation to DCPs and revealing some measures for the Portuguese context.
引用
收藏
页码:1164 / 1179
页数:16
相关论文
共 67 条
  • [1] Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran
    Abbasi, Omid
    Noorzai, Esmatullah
    Jafari, Kobra Gharouni
    Golabchi, Mahmood
    [J]. JOURNAL OF ARCHITECTURAL ENGINEERING, 2020, 26 (03)
  • [2] Delay mitigation in the Malaysian construction industry
    Abdul-Rahman, H
    Berawi, MA
    Berawi, AR
    Mohamed, O
    Othman, M
    Yahya, IA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (02) : 125 - 133
  • [3] Mixed Method Research: Fundamental Issues of Design, Validity, and Reliability in Construction Research
    Abowitz, Deborah A.
    Toole, T. Michael
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (01) : 108 - 116
  • [4] Assessment of the design-construction interface problems in the UAE
    AL Mousli, Mohamad Hazem
    El-Sayegh, Sameh Monir
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2016, 12 (05) : 353 - 366
  • [5] Adoption and implementation of BIM - case study of a Saudi Arabian AEC firm
    Almuntaser, Taqiadden
    Sanni-Anibire, Muizz O.
    Hassanain, Mohammad A.
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2018, 11 (03) : 608 - 624
  • [6] Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman
    Alnuaimi, Ali S.
    Taha, Ramzi A.
    Al Mohsin, Mohammed
    Al-Harthi, Ali S.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (05) : 615 - 622
  • [7] Alzebdeh K., 2015, J ENG RES, V12, P53, DOI [10.24200/tjer.vol12iss1pp53-68, DOI 10.24200/TJER.VOL12ISS1PP53-68]
  • [8] [Anonymous], 2016, Int. J. Bus. Econ. Res., DOI DOI 10.11648/J.IJBER.20160504.16
  • [9] A methodology for the development of delay mitigation measures in construction projects
    Arantes, Amilcar
    Ferreira, Luis Miguel D. F.
    [J]. PRODUCTION PLANNING & CONTROL, 2021, 32 (03) : 228 - 241
  • [10] Underlying causes and mitigation measures of delays in construction projects An empirical study
    Arantes, Amilcar
    Ferreira, Luis Miguel D. F.
    [J]. JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2020, 25 (02) : 165 - 181