Preconstruction Phase Management Practices Enhancing Labor Productivity in Multistory Building Projects

被引:1
作者
Tarekegn Gurmu, Argaw [1 ]
机构
[1] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
关键词
Preconstruction phase; Management practices; Multistory building projects; Construction labor productivity; CONSTRUCTION PROJECTS; PERCEPTIONS;
D O I
10.1061/JCEMD4.COENG-13145
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Implementation of appropriate management practices before commencing construction is vital to enhance construction productivity. This study aims to identify and prioritize preconstruction phase management practices (PCMPs) that can improve labor productivity in multistory building projects. Additionally, the objective of this research is to develop a stochastic model for predicting labor productivity based on the level of implementation of PCMPs. A thorough review of the literature was conducted to identify the practices that can increase construction productivity. Thereafter, questionnaires were distributed to principal contractors, and quantitative data were collected. After analyzing the data, the PCMPs were prioritized and a probability-based labor productivity prediction model was developed. The findings of the study revealed that well-defined scopes of work, short-interval plans, and buildability review are the top three PCMPs that can enhance labor productivity in multistory building projects. Correlation analysis showed that the relationship between labor productivity and PCMPs is statistically significant. The research showed that the relative importance of PCMPs varies based on project type. This study contributes to the body of knowledge by developing a novel tool to assess the levels of implementation of PCMPs and by building an innovative stochastic model for estimating labor productivity. Contractors can implement the practices identified in this research to augment the labor productivity of building projects, and use the model and a scoring tool to predict the labor productivity of multistory building projects.
引用
收藏
页数:15
相关论文
共 56 条
[1]  
Alinaitwe Henry Mwanaki, 2007, Journal of Civil Engineering and Management, V13, P169
[2]  
[Anonymous], 2014, Building and construction procurement guide, principles and options
[3]  
Australian Construction Industry Forum, 2016, BOOST CONSTR PROD PO
[4]  
Borg L., 2015, THESIS DEP REAL ESTA
[5]   Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects [J].
Caldas, Carlos H. ;
Kim, Jung-Yeol ;
Haas, Carl T. ;
Goodrum, Paul M. ;
Zhang, Di .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (01)
[6]   ROC-ing along: Evaluation and interpretation of receiver operating characteristic curves [J].
Carter, Jane V. ;
Pan, Jiamnin ;
Rai, Shesh N. ;
Galandiuk, Susan .
SURGERY, 2016, 159 (06) :1638-1645
[7]   Cost-benefit analysis of BIM-enabled design clash detection and resolution [J].
Chahrour, Racha ;
Hafeez, Mian Atif ;
Ahmad, Ahmad Mohammad ;
Sulieman, Hashim Ibnauf ;
Dawood, Huda ;
Rodriguez-Trejo, Sergio ;
Dawood, Nashwan .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2021, 39 (01) :55-72
[8]   Productivity improvements: understand the workforce perceptions of productivity first [J].
Chan, Paul W. ;
Kaka, Ammar .
PERSONNEL REVIEW, 2007, 36 (04) :564-584
[9]  
CII (Construction Industry Institute), 2013, BEST PROD PRACT IMPL
[10]  
City of Melbourne, 2005, CONSTRUCTION MANAGEM