共 39 条
[2]
[Anonymous], 2010, GB50011-2010
[7]
Chen J., 2019, STRUCT CONTROL HLTH, V26, P2440
[8]
Chen J., 2018, STRUCT CONTROL HLTH, V25, P2200
[9]
Phase I benchmark control problem for seismic response of cable-stayed bridges
[J].
JOURNAL OF STRUCTURAL ENGINEERING-ASCE,
2003, 129 (07)
:857-872
[10]
Elias S., 2019, STRUCT CONTROL HLTH, P25