Multi-stage resilient operation strategy of urban electric-gas system against rainstorms

被引:5
作者
Wang, Jingyao [1 ]
Li, Yao [1 ]
Bian, Jiayu [2 ]
Yu, Zhiyong [2 ]
Zhang, Min [3 ]
Wang, Cheng [1 ]
Bi, Tianshu [1 ]
机构
[1] North China Elect Power Univ, Sch Elect & Elect Engn, Beijing, Peoples R China
[2] State Grid Xinjiang Elect Power Co Ltd, Hotan Prefecture, Peoples R China
[3] State Grid Beijing Elect Power Res Inst, Beijing, Peoples R China
关键词
Urban electric-gas system; Resilient operation; Routing of repair crews; Multi-stage decision-making; Rainstorm disaster; POWER DISTRIBUTION; INTEGRATED POWER; MODEL; RECONFIGURATION; OPTIMIZATION; RESTORATION; FLOW;
D O I
10.1016/j.apenergy.2023.121507
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper proposes a multi-stage resilient operation strategy for an urban electric-gas system (UEGS) considering the impact of traffic under rainstorms. It guarantees that the defense budget in pre-disaster hardening can be assigned to cope with the worst scenario and that the load supply can be restored as soon as possible. For pre-disaster hardening, a more realistic multi-stage robust model (MSRM) of UEGS under rainstorms is proposed to accommodate the randomness and continuity of rainstorms. After transforming MSRM into the two-stage robust (TSR) form, the nested column-and-constraint generation (C & CG) method is applied for model solving, which is a mixed integer linear program with the min-max-min form. For the unacceptable computing time of the nested C & CG method in solving the equivalent TSR, a simplification is proposed using the sliding time window to provide defense priority for allocating the defense budget in pre-disaster hardening with a reduced calculation burden. In the recovery of UEGS, the traveling salesman problem model of repair crews routing with real-time traversal path information is proposed to meet the modeling demand of multi period attacks and waterlogging on paths caused by rainstorms. Case studies on the two test systems validate the effectiveness of the proposed method and demonstrate the support of the gas distribution network to the power distribution network in rainstorm attacks.
引用
收藏
页数:12
相关论文
共 36 条
[31]   A two-stage eco-cooling control strategy for electric vehicle thermal management system considering multi-source information fusion [J].
Zhao, Yihang ;
Dan, Dan ;
Zheng, Siyu ;
Wei, Mingshan ;
Xie, Yi .
ENERGY, 2023, 267
[32]   Operation strategy and performance investigation of a high-efficiency multifunctional two-stage vapor compression heat pump air conditioning system for electric vehicles in severe cold regions [J].
Ning, Qian ;
He, Guogeng ;
Xiong, Guohui ;
Sun, Wei ;
Song, Hai .
SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2021, 48
[33]   Meta-learning and proximal policy optimization driven two-stage emergency allocation strategy for multi-energy system against typhoon disasters [J].
Zhang, Guozhou ;
Hu, Weihao ;
Zhao, Yincheng ;
Cui, Zhengjie ;
Chen, Jianjun ;
Tang, Chao ;
Chen, Zhe .
RENEWABLE ENERGY, 2024, 237
[34]   Long-term, multi-stage low-carbon planning model of electricity-gas-heat integrated energy system considering ladder-type carbon trading mechanism and CCS [J].
Lei, Dayong ;
Zhang, Zhonghui ;
Wang, Zhaojun ;
Zhang, Liuyu ;
Liao, Wei .
ENERGY, 2023, 280
[35]   Risk-based electric power system planning for climate change mitigation through multi-stage joint-probabilistic left-hand-side chance-constrained fractional programming: A Canadian case study [J].
Wang, Lin ;
Huang, Gordon ;
Wang, Xiuquan ;
Zhu, Hua .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 82 :1056-1067
[36]   Two-stage stochastic operation considering day-ahead and real-time scheduling of microgrids with high renewable energy sources and electric vehicles based on multi-layer energy management system [J].
Azarhooshang, Alireza ;
Sedighizadeh, Davoud ;
Sedighizadeh, Mostafa .
ELECTRIC POWER SYSTEMS RESEARCH, 2021, 201