Water resources planning and management: from stakeholders' local actions to the global perspective

被引:0
|
作者
Ben-Daoud, Mohamed [1 ]
El Mahrad, Badr [2 ,3 ,4 ]
Morosanu, Gabriela Adina [5 ]
Ben-Daoud, Abderrahmane [6 ]
Swe, Wint Mon [4 ]
Elhassnaoui, Ismail [7 ]
Essahlaoui, Ali [1 ]
Eljaafari, Samir [1 ]
机构
[1] Moulay Ismail Univ, Fac Sci, Meknes, Morocco
[2] Brabners LLP, Murray Fdn, Horton House,Exchange St, Liverpool L2 3YL, England
[3] Mohammed V Univ Rabat, Fac Sci, Dept Earth Sci, Lab Geosci Water & Environm LG2E CERNE2D, Rabat, Morocco
[4] Univ Algarve, CIMA, FCT Gambelas Campus, P-8005139 Faro, Portugal
[5] Univ Bucharest, Romanian Acad, Inst Geog, Fac Geog, Bucharest, Romania
[6] IbnTofail Univ Kenitra, Fac Sci, Dept Geol, Geosci Lab, Kenitra, Morocco
[7] Hydraul Syst Anal Team Mohammadia Sch Engineers, Rabat, Morocco
关键词
Water management plan; IWRM; Water; Stakeholders' participation; IMPLEMENTATION; CHALLENGES; IWRM; BASIN;
D O I
10.1007/s40899-023-00919-x
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Water planning and management, especially during periods of water stress, is becoming challenging for water managers worldwide. The aim of the present study was to provide an integrated water resources management (IWRM) plan designed to water management implementation at the local scale. This study was conducted in Morocco, a country which opts for anticipatory and long-term planning for the 2021-2050. The objective-based stakeholder interaction approach was adopted to establish the impact relationship between stakeholders and to develop an integrated water resources management (IWRM) plan. Thus, ten actors were involved and twelve water-related issues were identified and analysed. As a result, an analysis of stakeholders' engagement was carried out based on an indicator framework on the impact between actors and the similarity between the actors' objectives. The stakeholder's analysis shows a high level of the objective similarity amongst some stakeholders which is very important indicator to recognise in the IWRM planning process. Furthermore, an IWRM plan was developed, which consisted of nine components aimed at either implementing or enhancing the water management process. This IWRM plan emphasised capacity building and stakeholders' participation as main input of the process. The findings provide a roadmap for effective IWRM implementation through the operationalization of water management actions.
引用
收藏
页数:16
相关论文
共 50 条