Flexibility improvement and stochastic multi-scenario hybrid optimization for an integrated energy system with high-proportion renewable energy

被引:105
作者
Yan, Rujing [1 ,2 ]
Wang, Jiangjiang [1 ]
Huo, Shuojie [1 ]
Qin, Yanbo [1 ]
Zhang, Jing [2 ]
Tang, Saiqiu [3 ]
Wang, Yuwei [4 ]
Liu, Yan [4 ]
Zhou, Lin [4 ]
机构
[1] North China Elect Power Univ, Sch Energy Power & Mech Engn, Baoding, Hebei, Peoples R China
[2] Guizhou Univ, Elect Engn Coll, Guiyang, Guizhou, Peoples R China
[3] Elect Power Res Inst Guizhou Power Grid Co Ltd, Guiyang, Guizhou, Peoples R China
[4] North China Elect Power Univ, Sch Econ & Management, Baoding, Hebei, Peoples R China
基金
中国国家自然科学基金;
关键词
Integrated energy system (IES); Multiple uncertainties; Hybrid optimization; Flexibility improvement; Variable condition property; Renewable energy curtailment; POWER-TO-HEAT; WIND POWER; GAS; ELECTRICITY; STATIONS; STORAGE;
D O I
10.1016/j.energy.2022.125779
中图分类号
O414.1 [热力学];
学科分类号
摘要
A strong heat-power coupling limitation, uncontrollable renewable energy, and the grid's limited adjustment capacity deteriorate the operational performance and increase the renewable energy curtailment for the inte-grated energy system (IES) with high-proportion renewable energy. This paper presents the unavailable oper-ating region problem of the traditional IES and its flexibility improvement mechanism of integrating with the gas boiler, electric boiler, power-to-gas (P2G), electrical energy storage and thermal energy storage. Subsequently, a two-stage optimization method is proposed to minimize the total cost containing the device investment, oper-ation, carbon emission penalty and renewable energy curtailment penalty and further determine the capacity of such five devices. The hybrid model incorporates deterministic capacity optimization and uncertain operating optimization of considering variable condition properties of devices. Herein, the multiple uncertainties are captured by a series of stochastic scenarios generated by a stochastic hierarchy scenario generation model of integrating a Latin hypercube sampling method with a repeatable 0-1 scenario curtailment model based on Wasserstein distance. Eventually, a comparative analysis of the integration of five devices in terms of economic performance and renewable energy accommodation is presented by using an industrial park case. The results show that the integration of the gas boiler possesses the best economic promotion effectiveness and reduces the total cost by 49.56%. The integration of such five devices can reduce the renewable energy curtailment rate. Especially, the electric boiler and P2G can decline this rate to zero. However, the promoted results of P2G's integration are at the expense of sharp growth in the total cost.
引用
收藏
页数:14
相关论文
共 62 条
[11]   Dynamic availability of energy storage in district heating networks for automatic generation control of a CHP plant [J].
Deng, Tuoyu ;
Tian, Liang ;
Hu, Bo ;
Liu, Xinping ;
Liu, Jizhen ;
Zhou, Guiping ;
Zhao, Yuanzhu .
APPLIED THERMAL ENGINEERING, 2021, 183 (183)
[12]   Simulation study on a novel solar aided combined heat and power system for heat-power decoupling [J].
Ding, Zeyu ;
Hou, Hongjuan ;
Duan, Liqiang ;
Huang, Chang ;
Hu, Eric ;
Yu, Gang ;
Zhang, Yumeng ;
Zhang, Nan .
ENERGY, 2021, 220
[13]  
[董骁翀 Dong Xiaochong], 2019, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V39, P4650
[14]   Analysis of displacing natural gas boiler units in district heating systems by using multi-objective optimization and different taxing approaches [J].
Dorotic, Hrvoje ;
Puksec, Tomislav ;
Duic, Neven .
ENERGY CONVERSION AND MANAGEMENT, 2020, 205
[15]  
Fang JK, 2018, IEEE POW ENER SOC GE
[16]   Solution sensitivity-based scenario reduction for stochastic unit commitment [J].
Feng Y. ;
Ryan S.M. .
Computational Management Science, 2016, 13 (1) :29-62
[17]  
Growe-Kuska N., 2003, 2003 IEEE BOLOGNA PO, V3, P152, DOI [10.1109/PTC.2003.1304379, DOI 10.1109/PTC.2003.1304379]
[18]   Optimal operation of regional integrated energy system considering demand response [J].
Guo, Zihao ;
Zhang, Ren ;
Wang, Li ;
Zeng, Shunqi ;
Li, Yajun .
APPLIED THERMAL ENGINEERING, 2021, 191
[19]   Financial scenario generation for stochastic multi-stage decision processes as facility location problems [J].
Hochreiter, Ronald ;
Pflug, Georg Ch. .
ANNALS OF OPERATIONS RESEARCH, 2007, 152 (1) :257-272
[20]   Heat and power load dispatching considering energy storage of district heating system and electric boilers [J].
Huang, Xianzheng ;
Xu, Zhaofeng ;
Sun, Yong ;
Xue, Yali ;
Wang, Zhe ;
Liu, Zhijun ;
Li, Zhenyuan ;
Ni, Weidou .
JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2018, 6 (05) :992-1003