Modeling Microreactor Requirements for High-Performance Computing

被引:1
作者
Lee, Alvin J. H. [1 ]
Wodrich, Lucas [1 ]
Kalinichenko, Dimitri [1 ]
Brooks, Caleb S. [1 ]
Kozlowski, Tomasz [1 ]
机构
[1] Univ Illinois, Dept Nucl Plasma & Radiol Engn, Urbana, IL 61801 USA
关键词
Microreactor; microgrid; clean energy; high-performance computing;
D O I
10.1080/00295450.2023.2276999
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The potential deployment of microreactors as a zero-emission source for critical applications within integrated energy systems such as microgrids has been gaining interest in recent years owing to the microreactors' dispatchable nature, modular design, small site footprint, and carbon-free generation. A particularly high-value but challenging application with rapidly growing demand is in the deployment of high-performance computing (HPC) clusters within microgrids. In this work, a model of a HPC cluster in an energy-diverse microgrid is developed to determine the requirements of a technology-agnostic microreactor deployed for such a challenging application. The minute-resolution simulations revealed that the cluster's electrical load fluctuation of up to 4.1 MW/min required a fast and responsive load-following capability. When the load-following capability of the microreactor was perturbed, the required microgrid storage capacity associated with having a 0.1 MW/min dispatchable microreactor decreased by two orders of magnitude as compared with load-following solely by energy storage devices, indicating that load-following capability in microreactors is of great value in such applications. The analysis methods described in this work can be extended to other microgrids, other HPC clusters, or other types of challenging applications, and can help microgrid planners in determining the storage size, output capacity, and ramping capabilities of the storage devices required for a given microgrid configuration.
引用
收藏
页码:1027 / 1041
页数:15
相关论文
共 24 条
[1]  
[Anonymous], NSRDB VIEW OPENEI DA
[2]  
[Anonymous], BLUE WAL SYST SUMM
[3]  
[Anonymous], 2020, RAMP RAMP CAP
[4]  
[Anonymous], 2019, BLUE WAT 2019 ANN RE
[5]  
[Anonymous], 2020, REAL TIM FIN MARK LM
[6]  
[Anonymous], RUNN JOBS OV
[7]  
[Anonymous], DAT TOOLS FIND STAT
[8]  
[Anonymous], EDNA MET UT DAT
[9]  
[Anonymous], SOL IRR DAT
[10]  
[Anonymous], 2013, TESL K20X GPU ACC BO