Stochastic forestry planning under market and growth uncertainty

被引:2
作者
Pais, Cristobal [1 ]
Weintraub, Andres [2 ]
Shen, Zuo-Jun Max [1 ]
机构
[1] Univ Calif Berkeley, Ind Engn & Operat Res Dept, Berkeley, CA 94720 USA
[2] Univ Chile, Ind Engn Dept, Santiago, Chile
关键词
OR in natural resources; Forestry planning; Stochastic programming; Progressive hedging; Parallel optimization; HARVEST SCHEDULING SUBJECT; AREA RESTRICTIONS; PROGRAMMING-MODEL; MANAGEMENT; DECOMPOSITION; OPTIMIZATION; SYSTEM;
D O I
10.1016/j.cor.2023.106182
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The forest planning problem with road construction consists of managing the timber production of a forest divided into harvest cells for a given planning horizon. Subject to uncertainty, it becomes a complex large-scale multi-stage stochastic problem expressed through scenarios. A suitable algorithm for these problems is progressive hedging (PH), which decomposes the problem by scenarios. A two-phase solving approach, in which PH is used as a heuristic method to obtain a directly optimized restricted model with fixed variables, is implemented. Multiple adjustments to improve the performance of the method are adopted and tested in a tactical case study. The performance of the proposed method is compared with those of traditional approaches. Thanks to these enhancements, we solved a real original problem including all the complexities of a practical problem not addressed in previous studies. Comprehensive computational results indicate the advantages of the method, including its ability to efficiently solve instances of up to 1000 scenarios by exploiting its parallel implementation.
引用
收藏
页数:16
相关论文
共 50 条
[11]   The value of the stochastic solution in multistage problems [J].
Escudero, Laureano F. ;
Garin, Araceli ;
Merino, Maria ;
Perez, Gloria .
TOP, 2007, 15 (01) :48-64
[12]   BFC-MSMIP: an exact branch-and-fix coordination approach for solving multistage stochastic mixed 0-1 problems [J].
Escudero, Laureano F. ;
Garin, Araceli ;
Merino, Maria ;
Perez, Gloria .
TOP, 2009, 17 (01) :96-122
[13]   Solving Stochastic Transportation Network Protection Problems Using the Progressive Hedging-based Method [J].
Fan, Yueyue ;
Liu, Changzheng .
NETWORKS & SPATIAL ECONOMICS, 2010, 10 (02) :193-208
[14]   Accounting for climate change in a forest planning stochastic optimization model [J].
Garcia-Gonzalo, Jordi ;
Pais, Cristobal ;
Bachmatiuk, Joanna ;
Weintraub, Andres .
CANADIAN JOURNAL OF FOREST RESEARCH, 2016, 46 (09) :1111-1121
[15]   Harvest scheduling subject to maximum area restrictions: Exploring exact approaches [J].
Goycoolea, M ;
Murray, AT ;
Barahona, F ;
Epstein, R ;
Weintraub, A .
OPERATIONS RESEARCH, 2005, 53 (03) :490-500
[16]  
Goycoolea M, 2009, FOREST SCI, V55, P149
[17]   Cutting Planes for Multistage Stochastic Integer Programs [J].
Guan, Yongpei ;
Ahmed, Shabbir ;
Nemhauser, George L. .
OPERATIONS RESEARCH, 2009, 57 (02) :287-298
[18]   Model tightening for integrated timber harvest and transportation planning [J].
Guignard, M ;
Ryu, C ;
Spielberg, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 111 (03) :448-460
[19]   A Progressive Hedging Approach for Surgery Planning Under Uncertainty [J].
Gul, Serhat ;
Denton, Brian T. ;
Fowler, John W. .
INFORMS JOURNAL ON COMPUTING, 2015, 27 (04) :755-772
[20]   Progressive hedging as a meta-heuristic applied to stochastic lot-sizing [J].
Haugen, KK ;
Lokketangen, A ;
Woodruff, DL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 132 (01) :116-122