共 39 条
- [26] DRY GAS CLEANING SYSTEM FOR BIOMASS GASIFICATION POWER GENERATION (PERFORMANCE VERIFICATION BY TESTS WITH PILOT PLANT AND FEASIBILITY EVALUATION) PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON POWER ENGINEERING 2009 (ICOPE-09), VOL 1, 2009, : 231 - 236
- [30] Ion Exchange Processes for CO2 Mineralization Using Industrial Waste Streams: Pilot Plant Demonstration and Life Cycle Assessment CHEMISTRYSELECT, 2024, 9 (18):