共 50 条
- [41] PHASE DISTRIBUTION OF HIGH-PRESSURE STEAM-WATER FLOW AT LARGE-DIAMETER TEE JUNCTIONS JOURNAL OF FLUIDS ENGINEERING-TRANSACTIONS OF THE ASME, 1994, 116 (03): : 592 - 598
- [42] Study on upper-bound limit method of face stability of shield tunnel with high-water pressure Feng, L. (flpa607@163.com), 1600, Science Press (41):
- [47] Application of mechanical shield docking method under high ground water pressure TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 677 - 683
- [49] Dynamic response analysis of ultra-large diameter shield tunnel in uneven soft and hard strata under surface blast load Zhendong yu Chongji/Journal of Vibration and Shock, 2024, 43 (21): : 12 - 20