Probabilistic Forecasting-Based Reserve Determination Considering Multi-Temporal Uncertainty of Renewable Energy Generation

被引:7
作者
Xu, Yuqi [1 ]
Wan, Can [1 ]
Liu, Hui [2 ]
Zhao, Changfei [1 ]
Song, Yonghua [1 ,3 ]
机构
[1] Zhejiang Univ, Coll Elect Engn, Hangzhou 310027, Peoples R China
[2] Guangxi Univ, Sch Elect Engn, Nanning 530004, Peoples R China
[3] Univ Macau, State Key Lab Internet Things Smart City, Taipa, Macau, Peoples R China
基金
中国国家自然科学基金;
关键词
Reserve determination; probabilistic forecasting; multi-temporal uncertainty; regulating reserve; ramp capability reserve; Ito-process model; OPTIMAL POWER-FLOW;
D O I
10.1109/TPWRS.2023.3252720
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Operating reserve, among the most important ancillary services, is a powerful prescription for mitigating increasing uncertainty of renewable generation. Traditional reserve determination neglects uncertainty of renewable generation variations within the dispatch interval, which cannot guarantee sufficient reserve deliverability in real-time operation. This article proposes a probabilistic forecasting-based reserve determination method to efficiently deal with multi-temporal uncertainty of renewable energy in power systems. A novel probabilistic forecasting approach is proposed by integrating Dirichlet process Gaussian mixture model into bootstrap-based extreme learning machine. A unified uncertainty model is constructed for depicting both interval-averaged uncertainty and intra-interval uncertainty by combing the probabilistic forecasts and linearized Ito-process model. In current business practices of many independent system operators, the coordinated determination of two well-designed reserve products, including regulating reserve and ramp capability reserve, is formulated in a two-stage robust optimization framework. A Bernstein polynomial-based model reformulation approach is then employed to handle the existing heterogeneity in the sub-models of each stage. Consequently, the integrated reserve determination is embedded in a generic two-stage robust optimization problem, which can be efficiently solved by the adopted modified column-and-constraint generation method. Finally, numerical simulations are implemented to validate the effectiveness and profitability of the proposed approach.
引用
收藏
页码:1019 / 1031
页数:13
相关论文
共 40 条
  • [1] 50Hertz Amprion, 2020, Tech. Rep.
  • [2] Agency for the Cooperation of Energy Regulators, 2019, Tech. Rep.
  • [3] Agency for the Cooperation of Energy Regulators, 2018, Tech. Rep.
  • [4] Aguado M., 2012, Tech. Rep. C5-204
  • [5] Amprion, 2019, Tech. Rep.
  • [6] Amprion APX-ENDEX Belpex Creos Elia EnBW EPEX SPOT RTE and TenneT, 2011, CWE enhanced flow-based MC feasibility report
  • [7] Amprion Rte, 2015, CWE flow based market coupling project: Parallel run performance report
  • [8] [Anonymous], 2019, Official Journal of the European Union Regulation (EU) No 2019/1009 of the European Parliament and of the Council Laying down Rules on the Making Available on the Market of EU Fertilising Products and Amendig
  • [9] Chance-Constrained Optimal Power Flow: Risk-Aware Network Control under Uncertainty
    Bienstock, Daniel
    Chertkov, Michael
    Harnett, Sean
    [J]. SIAM REVIEW, 2014, 56 (03) : 461 - 495
  • [10] Byers C., 2020, P IEEE 17 INT C EUR, P1