Exploring Risk Factors Affecting Sustainable Outcomes of Global Public-Private Partnership (PPP) Projects: A Stakeholder Perspective

被引:5
|
作者
Li, Zilin [1 ]
Wang, Haotian [2 ]
机构
[1] Renmin Univ China, Sch Publ Adm & Policy, Beijing 100872, Peoples R China
[2] UCL, Bartlett Fac Built Environm, London WC1E 6BT, England
关键词
public-private partnership (PPP); risk factors; sustainable outcomes; stakeholder relationship; CRITICAL SUCCESS FACTORS; PARTICIPATION PROJECTS; VOLATILITY; POLICY; INVESTMENTS; GOVERNANCE; DEBT;
D O I
10.3390/buildings13092140
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
As a model for delivering infrastructure initiatives, public-private partnerships (PPPs) have gained significant popularity in recent years. The globalization of PPP has exposed them to elevated risks emanating from the international real economy and financial market, which can ultimately result in project cancellations or distress. This study analyzes risk factors affecting the sustainable outcomes of global PPP projects from a stakeholder perspective. After identifying the interests of key stakeholders and examining how various risks influence stakeholders' interests, a two-step binomial probit model is used to investigate domestic and international risk factors in PPP arrangements based on the World Bank PPI database. The empirical results indicate that inflation has a substantially positive effect on project failure, while factors such as PPP experience, central government involvement, exchange rate fluctuations, etc., significantly contribute to PPP success. In addition, the study demonstrates that trade openness and net foreign direct investment (FDI) inflow are crucial for the transmission of global risks. The study also provides policy implications and recommendations from a risk allocation-stakeholder relationship perspective to enhance the resilience of PPP initiatives based on these findings.
引用
收藏
页数:31
相关论文
共 50 条
  • [21] Mitigation strategies of public-private partnership (PPP) barriers in Palestinian construction projects
    Mousa, Kawther
    Zhang, Zhenglian
    Sumarliah, Eli
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (08) : 3124 - 3147
  • [22] Institutional entrepreneurship and infrastructure public-private partnership (PPP): Unpacking the role of social actors in implementing PPP projects
    Biygautane, Mhamed
    Neesham, Cristina
    Al-Yahya, Khalid Othman
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2019, 37 (01) : 192 - 219
  • [23] Strategies of perceived justice for added value in public-private partnership (PPP) projects
    Cheng, Mengyuan
    Chong, Heap-Yih
    Liu, Guoliang
    Li, Qian
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [24] Tourism public-private partnership (PPP) projects: an exploratory-sequential approach
    Ghanem, Marwa
    Elshaer, Ibrahim
    Saad, Samar
    TOURISM REVIEW, 2022, 77 (02) : 427 - 450
  • [25] Investigation of factors affecting sustainability in public-private partnerships for infrastructure projects
    Ahmadi, Loqman
    Arbabi, Hani
    Sobhiyah, Mohammad Hossein
    Laali, Avin
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2024,
  • [26] Critical success factors for public-private partnership projects in Uganda
    Rogers Mwesigwa
    Justine Nanteza
    Joseph Mayengo
    Ruth Nabwami
    Joshua Tumwesige
    SN Business & Economics, 4 (11):
  • [27] Sustainable performance assessment of public-private partnership infrastructure projects in Ghana
    Akomea-Frimpong, Isaac
    Jin, Xiaohua
    Osei-Kyei, Robert
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2025,
  • [28] Review of studies on the Critical Success Factors for Public-Private Partnership (PPP) projects from 1990 to 2013
    Osei-Kyei, Robert
    Chan, Albert P. C.
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (06) : 1335 - 1346
  • [29] Identification of Various Execution Modes and Their Respective Risks for Public-Private Partnership (PPP) Infrastructure Projects
    Akhtar, Muhammad
    Mufti, Nadeem Ahmad
    Mubin, Sajjad
    Saleem, Muhammad Qaiser
    Zahoor, Sadaf
    Ullah, Sanna
    BUILDINGS, 2023, 13 (08)
  • [30] Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects
    Owusu-Manu, De-Graft
    Kukah, Augustine Senanu
    Boateng, Frank
    Asumadu, George
    Edwards, David John
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (02) : 358 - 372