Unrelated parallel machine energy-efficient scheduling considering sequence-dependent setup times and time-of-use electricity tariffs

被引:4
作者
Sanati, Hemen [1 ]
Moslehi, Ghasem [1 ]
Reisi-Nafchi, Mohammad [1 ]
机构
[1] Isfahan Univ Technol, Dept Ind & Syst Engn, Esfahan 8415683111, Iran
关键词
Energy-efficient scheduling; Mixed-integer linear programming; Fix and relax; Sequence-dependent setup time; Tariffs; HYBRID FLOW-SHOP; ALGORITHM; MODEL; CONSUMPTION; FIX;
D O I
10.1016/j.ejco.2022.100052
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Given that about half of the produced energy in the world is consumed in industries, there has been an increasing con-cern about optimizing energy consumption in manufacturing sectors. As one of the most effective ways, proper produc-tion scheduling to reduce energy consumption is of crucial importance among researchers and manufacturers. This pa-per addresses an unrelated parallel machine energy-efficient scheduling problem with sequence-dependent setup times by considering different energy consumption tariffs. The setup times are studied in two modes: disjointed from/jointed to processing time. For each one of these problems, two mixed -integer linear programming models have been formulated. The presented models for the problem with setup time disjointed from processing time can solve up to 16 machines and 45 jobs. In contrast, this capability is changed to 20 machines and 40 jobs for processing time jointed to the setup time problem. Furthermore, a fix and relax heuristic algorithm is presented for large-size instances, which can solve instances of up to 20 machines and 100 jobs for each of the two considered prob-lems. (c) 2022 The Author(s). Published by Elsevier Ltd on behalf of Association of European Operational Research Societies (EURO). This is an open access article under the CC BY-NC-ND license
引用
收藏
页数:21
相关论文
共 34 条
[1]   Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing [J].
Abikarram, Jose Batista ;
McConky, Katie ;
Proano, Ruben .
JOURNAL OF CLEANER PRODUCTION, 2019, 208 :232-242
[2]   An NSGA-II-Based Memetic Algorithm for an Energy-Efficient Unrelated Parallel Machine Scheduling Problem with Machine-Sequence Dependent Setup Times and Learning Effect [J].
Bektur, Gulcin .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2022, 47 (03) :3773-3788
[3]   A mathematical model and heuristic algorithms for an unrelated parallel machine scheduling problem with sequence-dependent setup times, machine eligibility restrictions and a common server [J].
Bektur, Gulcin ;
Sarac, Tugba .
COMPUTERS & OPERATIONS RESEARCH, 2019, 103 :46-63
[4]   Fix and relax heuristic for a stochastic lot-sizing problem [J].
Beraldi, P ;
Ghiani, G ;
Grieco, A ;
Guerriero, E .
COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2006, 33 (2-3) :303-318
[5]   An efficient scheduling approach for an iron-steel plant equipped with self-generation equipment under time-of-use electricity tariffs [J].
Cao, Jianhua ;
Pan, Ruilin ;
Xia, Xue ;
Shao, Xuemei ;
Wang, Xuemin .
SWARM AND EVOLUTIONARY COMPUTATION, 2021, 60
[6]   Energy-conscious unrelated parallel machine scheduling under time-of-use electricity tariffs [J].
Che, Ada ;
Zhang, Shibohua ;
Wu, Xueqi .
JOURNAL OF CLEANER PRODUCTION, 2017, 156 :688-697
[7]   A memetic algorithm for energy-efficient scheduling of integrated production and shipping [J].
Chen, Jian ;
Ning, Tong ;
Xu, Gangyan ;
Liu, Yang .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2022, 35 (10-11) :1246-1268
[8]   An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price [J].
Cheng, Junheng ;
Chu, Feng ;
Zhou, Mengchu .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (02) :896-899
[9]   Dispatching rule-based scheduling algorithms in a single machine with sequence-dependent setup times and energy requirements [J].
Choi, Yong-Chan .
RESEARCH AND INNOVATION IN MANUFACTURING: KEY ENABLING TECHNOLOGIES FOR THE FACTORIES OF THE FUTURE - PROCEEDINGS OF THE 48TH CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2016, 41 :135-140
[10]   Bi-criteria formulation for green scheduling with unrelated parallel machines with sequence-dependent setup times [J].
Cota, Luciano P. ;
Coelho, Vitor N. ;
Guimaraes, Frederico G. ;
Souza, Marcone J. F. .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2021, 28 (02) :996-1017