Production, maintenance and resource scheduling: A review

被引:78
作者
Geurtsen, M. [1 ,2 ]
Didden, Jeroen B. H. C. [1 ]
Adan, J. [1 ,2 ]
Atan, Z. [1 ]
Adan, I. [1 ]
机构
[1] Eindhoven Univ Technol, Dept Ind Engn, NL-5600 MB Eindhoven, Netherlands
[2] Nexperia, Equipment & Automation Technol E&A, Jonkerbospl 52, NL-6534 AB Nijmegen, Netherlands
关键词
Scheduling; Review; Production; Maintenance; Resource; FLEXIBLE JOB-SHOP; RATE-MODIFYING ACTIVITIES; PARALLEL DEDICATED MACHINES; 2-MACHINE FLOW-SHOP; TIME-DEPENDENT DETERIORATION; COLUMN GENERATION TECHNIQUE; MINIMIZING TOTAL TARDINESS; META-HEURISTIC ALGORITHMS; 2-STAGE HYBRID FLOWSHOP; ARTIFICIAL BEE COLONY;
D O I
10.1016/j.ejor.2022.03.045
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Production scheduling that involves maintenance activities and resource constraints plays a crucial role in manufacturing and service environments of the modern age. While research on the combination of production-maintenance scheduling and production-resource scheduling is constantly increasing, limited research is available on the integration of all three aforementioned scheduling problems. To unite both research directions, this paper provides a detailed review on both the integration of maintenance and resource with production as well as a review on all three scheduling problems together. This paper is the first survey paper to provide an extensive review on the combinations of production, maintenance and resource scheduling of approximately 250 papers that have appeared until the end of 2020. We not only provide a concise summary of the conducted research, but also offer recommendations for future research directions guided by practical importance.(c) 2022 The Author(s). Published by Elsevier B.V. This is an open access article under the CC BY license ( http://creativecommons.org/licenses/by/4.0/ )
引用
收藏
页码:501 / 529
页数:29
相关论文
共 247 条
[1]   Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints [J].
Abdeljaoued, Mohamed Amine ;
Saadani, Nour El Houda ;
Bahroun, Zied .
OPERATIONAL RESEARCH, 2020, 20 (04) :2109-2132
[2]   A multi-population, multi-objective memetic algorithm for energy-efficient job-shop scheduling with deteriorating machines [J].
Abedi, Mehdi ;
Chiong, Raymond ;
Noman, Nasimul ;
Zhang, Rui .
EXPERT SYSTEMS WITH APPLICATIONS, 2020, 157
[3]  
Abedi M, 2017, J MODEL MANAG, V12, P525, DOI 10.1108/JM2-02-2016-0011
[4]   Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions [J].
Afzalirad, Mojtaba ;
Rezaeian, Javad .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 :40-52
[5]   Minimizing the makespan for the flow shop scheduling problem with availability constraints [J].
Aggoune, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 153 (03) :534-543
[6]   Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan [J].
Allaoui, H. ;
Lamouri, S. ;
Artiba, A. ;
Aghezzaf, E. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) :161-167
[7]   Scheduling a dual-resource flexible job shop with makespan and due date-related criteria [J].
Andrade-Pineda, Jose L. ;
Canca, David ;
Gonzalez-R, Pedro L. ;
Calle, M. .
ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) :5-35
[8]  
[Anonymous], 2014, INT J MATH COMPUTERS
[9]   A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems [J].
Araz, Oezlem Uzun ;
Salum, Latif .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (01) :251-270
[10]  
Araz OU, 2005, LECT NOTES ARTIF INT, V3809, P1047