Optimizing maintenance of vertical curves in high-speed railways

被引:12
作者
Zhang, Yuxiao [1 ]
Shi, Jin [1 ]
Tan, Shehui [2 ]
Wang, Yingjie [1 ]
机构
[1] Beijing Jiaotong Univ, Sch Civil Engn, Beijing, Peoples R China
[2] China Railway Shanghai Grp Co Ltd, Track Maintenance Dept, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
High-speed railway; Precise maintenance; Alignment optimization; Vertical curve; Track irregularity; LATERAL DYNAMIC-RESPONSE; TRACK GEOMETRY; OPTIMIZATION; TRAIN; IRREGULARITIES; IMPROVEMENT; ALIGNMENT;
D O I
10.1016/j.autcon.2023.104947
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The relationship between railway alignment and passenger comfort under high-speed driving conditions is even closer, requiring alignment smoothness to a greater extent. However, vertical curve dynamic detection alarm is a chronic, difficult-to-resolve issue in operational high-speed railways. Therefore, a novel method combining alignment parameters and track geometry from the perspective of smoothness is proposed to optimize the curve radius by controlling elevation differences and to calculate track adjustments by improving the long wavelength irregularity. To validate the performance, the proposed method is adopted to develop vertical curve maintenance schemes for Beijing-Hong Kong high-speed railway, and the daily average number of level II warnings of vertical acceleration decreased by 95% after applying the schemes. The results demonstrate that the proposed method effectively improves alignment smoothness in the dynamic detection alarm section. The method still needs to be subsequently extended to improve its adaptability to different irregularity bands and complex line conditions.
引用
收藏
页数:17
相关论文
共 46 条
[1]   Uncertainty in Rail-Track Geometry Degradation: Lisbon-Oporto Line Case Study [J].
Andrade, A. Ramos ;
Teixeira, P. Fonseca .
JOURNAL OF TRANSPORTATION ENGINEERING, 2011, 137 (03) :193-200
[2]   Unplanned-maintenance needs related to rail track geometry [J].
Andrade, Antonio Ramos ;
Teixeira, Paulo Fonseca .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 2014, 167 (06) :400-410
[3]   The effects of tamping on railway track geometry degradation [J].
Audley, M. ;
Andrews, J. D. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2013, 227 (04) :376-391
[4]   A new approach to the analysis and presentation of vertical track geometry quality and rail roughness [J].
Berggren, Eric G. ;
Li, Martin X. D. ;
Spannar, Jan .
WEAR, 2008, 265 (9-10) :1488-1496
[5]  
CEN (European Committee for Standardization), 2017, Railway applications: Track: Track geometry quality. Part 5: Geometric quality levels: Plain line, switches and crossings
[6]  
CEN (European Committee for Standardization), 2019, Railway applications: Track: Track geometry quality: Part 1: Characterization of track geometry
[7]   Experimental and numerical investigations of asymmetric chord-reference system regarding track geometry measurement [J].
Cong, Jianli ;
Tang, Huiyue ;
Wang, Yuan ;
Chen, Rong ;
Wang, Ping .
MEASUREMENT, 2021, 182
[8]   MEASUREMENT, INTERPRETATION AND CLASSIFICATION OF SOUTH-AFRICAN TRACK GEOMETRY [J].
FROHLING, RD .
VEHICLE SYSTEM DYNAMICS, 1995, 24 :133-145
[9]   Data-driven predictive maintenance scheduling policies for railways [J].
Gerum, Pedro Cesar Lopes ;
Altay, Ayca ;
Baykal-Gursoy, Melike .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2019, 107 :137-154
[10]   Model-based quality assurance in railway infrastructure planning [J].
Haeussler, Marco ;
Borrmann, Andre .
AUTOMATION IN CONSTRUCTION, 2020, 109