Study on deformation control of overlying strata in short-wall coordinated filling mining of thick coal seam under aquifer

被引:4
作者
Yao, Yinan [1 ,2 ]
Jiang, Pengfei [3 ]
Zhou, Nan [1 ,2 ]
Du, Erbao [1 ,2 ]
机构
[1] China Univ Min & Technol, State Key Lab Coal Resources & Safe Min, Xuzhou, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Sch Mines, Xuzhou, Jiangsu, Peoples R China
[3] China Coal Res Inst, Coal Min Branch, Beijing, Peoples R China
关键词
water protection mining; short-wall coordinated filling mining; overburden deformation; fracture development; engineering design;
D O I
10.3389/feart.2022.1097551
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The mining of coal resources and the protection of water resources are often in opposition, and this contradiction is more prominent in the mining of thick coal seams due to the difficulty of controlling the overburden deformation. Based on the mining conditions of thick coal seam under the main aquifer of a coal mine in the water shortage area of Northwest China, this paper puts forward the short-wall coordinated filling mining (SCFM) of thick coal seam. The stress analysis of the overall structure consisting of the top and bottom plates, coal pillars and filler at each stage of the mining process was carried out, the length of the short-walled working face suitable for this coal mine was derived, and the key parameters for the mining of the three pan areas of the mine were designed. The analysis results show that the sensitivity of the maximum tensile stress in the roof to the length of the working face is better than the filling rate in the case of short-walled working face arrangement. When the design coal mine working face length is 40 m and the filling rate is 95%, the overburden fissure development height can be controlled to 58.45 m after the whole area of three pan area is retrieved. It is verified by the downhole injection method that the requirement of non-conducting aquifer is satisfied after using SCFM. The research in this paper is of great significance to achieve safe and efficient recovery of coal resources and water conservation under strongly water-rich rock formations.
引用
收藏
页数:13
相关论文
共 29 条
[11]  
[李猛 Li Meng], 2014, [煤炭学报, Journal of China Coal Society], V39, P2369
[12]   Macro-Micro Response Characteristics of Surrounding Rock and Overlying Strata towards the Transition from Open-Pit to Underground Mining [J].
Li, Xiaoshuang ;
Yang, Shun ;
Wang, Yunmin ;
Nie, Wen ;
Liu, Zhifang .
GEOFLUIDS, 2021, 2021
[13]   Environmentally sustainable mining: a case study of intermittent cut-and-fill mining under sand aquifers [J].
Liu, Jiawei ;
Sui, Wanghua ;
Zhao, Qingjie .
ENVIRONMENTAL EARTH SCIENCES, 2017, 76 (16)
[14]  
Liu SL, 2018, MINE WATER ENVIRON, V37, P312, DOI 10.1007/s10230-017-0501-1
[15]   Predicting the height of the water-conducting fractured zone using multiple regression analysis and GIS [J].
Liu, Yong ;
Yuan, Shichong ;
Yang, Binbin ;
Liu, Jiawei ;
Ye, Zhaoyong .
ENVIRONMENTAL EARTH SCIENCES, 2019, 78 (14)
[16]   The height of fractured water-conducting zone in undermined rock strata [J].
Miao, Xiexing ;
Cui, Ximin ;
Wang, Jin'an ;
Xu, Jialin .
ENGINEERING GEOLOGY, 2011, 120 (1-4) :32-39
[17]   Varying effects of mining development on ecological conditions and groundwater storage in dry region in Inner Mongolia of China [J].
Shen, Zexi ;
Zhang, Qiang ;
Chen, Deliang ;
Singh, Vijay P. .
JOURNAL OF HYDROLOGY, 2021, 597
[18]   Reasonable gangue section length for disposing gangue pollutants in the new green mixed workface [J].
Tai, Yang ;
Guo, Shuai ;
Lan, Lixin .
BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2020, 79 (04) :1669-1682
[19]  
Wang G., 2015, THESIS CHINA U MININ
[20]   Surface subsidence control during bag filling mining of super high-water content material in the Handan mining area [J].
Wang, Xufeng ;
Zhang, Dongsheng ;
Sun, Chundong ;
Wang, Yang .
INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2016, 13 (01) :87-102