Spatio-temporal optimization of construction elevator planning in high-rise building projects

被引:1
|
作者
Wu, Keyi [1 ]
de Soto, Borja Garcia [1 ]
机构
[1] New York Univ Abu Dhabi, Div Engn, SMART Construct Res Grp, Abu Dhabi, U Arab Emirates
来源
DEVELOPMENTS IN THE BUILT ENVIRONMENT | 2024年 / 17卷
关键词
Construction hoist; Temporary elevator; Vertical transportation; Mixed-integer programming; TRANSPORTATION; SIMULATION; HOIST; TIME;
D O I
10.1016/j.dibe.2024.100328
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Appropriate construction elevator planning is beneficial for successfully completing high-rise building projects. Construction elevator planning typically remains unchanged throughout a high-rise building project or seldom involves the designation of service days, which causes such planning not to respond effectively to variable transportation demands and adversely affects the possibility of further optimization. Another limitation is that the installation and dismantlement dates of construction elevators, which are highly important when multiple construction elevators are used, cannot be explicitly determined in construction elevator planning. To solve these weaknesses, this paper proposes an approach to assign construction elevator cabs to serve designated days and floors based on actual transportation demands from the perspective of spatio-temporal optimization with mixedinteger programming. The experimental case study results show that the presented planning can significantly reduce the total cost when compared to other planning and can provide evidence and explanation for determining the installation and dismantlement dates of construction elevators.
引用
收藏
页数:25
相关论文
共 50 条
  • [21] Spatio-temporal deduction of floor construction based on the agent modeling of construction actors
    Liu, Boda
    Yang, Bin
    Zhang, Binghan
    Dong, Miaosi
    Jiang, Shanshan
    Xiao, Jianzhuang
    AUTOMATION IN CONSTRUCTION, 2022, 142
  • [22] Experimental study on upward movement in a high-rise building
    Lam, Joyce H. T.
    Yuen, Jason K. K.
    Lee, Eric W. M.
    Lee, Raymond Y. Y.
    SAFETY SCIENCE, 2014, 70 : 397 - 405
  • [23] Fire Egress System Optimization of High-Rise Teaching Building Based on Simulation and Machine Learning
    Zhou, Muchen
    Zhou, Bailing
    Zhang, Zhuo
    Zhou, Zuoyao
    Liu, Jing
    Li, Boyu
    Wang, Dong
    Wu, Tao
    FIRE-SWITZERLAND, 2023, 6 (05):
  • [24] Exploring the optimization potential of thermal and power performance for a low-energy high-rise building
    Chen, Xi
    Huang, Junchao
    Zhang, Weilong
    Yang, Hongxing
    INNOVATIVE SOLUTIONS FOR ENERGY TRANSITIONS, 2019, 158 : 2469 - 2474
  • [25] A wireless paging network with load-balancing equal opportunity routing in high-rise building construction
    Yang, Guangxiang
    Liang, Hua
    INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS, 2018, 14 (10):
  • [26] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 130
  • [27] Predicting air pressure in drainage stack of high-rise building
    Wong, E. S. W.
    Li, Ying-lin
    Zhu, Zuo-jin
    APPLIED MATHEMATICS AND MECHANICS-ENGLISH EDITION, 2013, 34 (03) : 351 - 362
  • [28] Probabilistic Seismic Loss Assessment of a Vancouver High-Rise Building
    Koduru, S. D.
    Haukaas, T.
    JOURNAL OF STRUCTURAL ENGINEERING, 2010, 136 (03) : 235 - 245
  • [29] Analysis of wind impacts on the high-rise building "Iset Tower"
    Alekhin, V. N.
    Antipin, A. A.
    Gorodilov, S. N.
    MECHANICAL ENGINEERING, MATERIALS AND ENERGY II, 2013, 281 : 639 - 644
  • [30] Experimental study on evacuation process in a stairwell of a high-rise building
    Fang, Zhi-Ming
    Song, Wei-Guo
    Li, Zi-Juan
    Tian, Wei
    Lv, Wei
    Ma, Jian
    Xiao, Xia
    BUILDING AND ENVIRONMENT, 2012, 47 : 316 - 321