Modelling of heating furnace fire scenarios using fault tree analysis, a bayesian network, and a thermal transfer method for system reliability analysis

被引:4
|
作者
Nehal, Naima [1 ]
Lounis, Zakia [2 ]
Bouhadiba, Brahim [1 ]
Lounis, Zoubida [1 ]
机构
[1] Univ Mohamed Ben Ahmed Oran 2, Inst Maintenance & Securite Ind, Lab Ingn Secur Ind & Dev Durable, Secur Ind & Environm, Oran 31000, Algeria
[2] Ecole Natl Polytech Oran Maurice Audin, Lab Mat LABMAT, Oran 31000, Algeria
关键词
System?s reliability; Bayesian network; Fault tree analysis; Performance parameters; Furnace; Probabilistic importance factors; TRANSFER COEFFICIENT; RISK ANALYSIS; FAILURE; HAZARD; SHELL;
D O I
10.1016/j.jlp.2023.104995
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Energy production for oil companies requires high-performance equipment. However, after a certain period of use, this equipment could be damaged, causing numerous problems and defects, impeding production, and leading to incidents that may cause material and human losses. Therefore, it is necessary to master the perfor-mance parameters of each equipment, which are key indicators of its functionality and can indicate the possi-bility of reusing it after inspection and diagnosis. However, it is worth noting that the studied system is a vertical cylindrical furnace in Algeria's refinery. This paper describes a new hybrid approach, a methodology that evaluates system reliability by combining two studies. The first is based on the surety of the system's functioning through an analysis with a fault tree to identify the risks, followed by a quantitative analysis using a Bayesian method. The second study follows the thermal calculation of the equipment's performance parameters, namely: the thermal efficiency (eta), heat transfer coefficient (h), and heat absorbed quantity (Q), using heat balance equations to quantify the heat absorbed quantity and identify the fluid flow regime inside the tube. The calculation considers three cases: The design case, the failure case, and the after renovation case. The originality of this work appears when the collected findings from the second study are fed into the first study's Bayesian Network (BN) to analyse the system's reliability using the calculated parameters. Then, BN is used to calculate the Probabilistic Importance Factors (PIFs) in order to identify the most impactful system components. Finally, a prediction analysis was conducted. The latter reveals that one of the furnace's major faults is the fumes accu-mulation inside the combustion chamber. Corrosion, overheating, coke formation inside the tubes, dumper deformation, and burner tip clogging all contribute to this fault.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] USING FAULT TREE ANALYSIS WITH COBIT 5 RISK SCENARIOS
    Modi, Shivani
    Butakov, Sergey
    Zavarsky, Pavol
    2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 385 - 390
  • [32] Phased mission modelling using fault tree analysis
    La Band, RA
    Andrews, JD
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2004, 218 (E2) : 83 - 91
  • [33] Reliability Modelling of Subsea Cluster Manifolds based on the Fault Tree Analysis
    Wang, Yingying
    Li, Fangqiu
    Duan, Menglan
    Liu, Houfa
    Gu, Jiandong
    PROCEEDINGS OF THE ASME 35TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING , 2016, VOL 3, 2016,
  • [34] Probabilistic Transformer Fault Tree Analysis Using Bayesian Networks
    Cheim, Luiz
    Lin, Lan
    Dagnino, Aldo
    2014 IEEE PES T&D CONFERENCE AND EXPOSITION, 2014,
  • [35] Dependability analysis of generator phase fault protection system using fault tree method
    Nadji, B
    Karakache, M
    Abazi-Simeu, Z
    UPEC 2004: 39th International Universitities Power Engineering Conference, Vols 1-3, Conference Proceedings, 2005, : 810 - 814
  • [36] Study on Reliability of Sorting System Based on Fault Tree Analysis
    Xu, Y. Z.
    Lv, W.
    Wang, Z. L.
    MANUFACTURING, DESIGN SCIENCE AND INFORMATION ENGINEERING, VOLS I AND II, 2015, : 720 - 726
  • [37] Reliability analysis method of a solar array by using fault tree analysis and fuzzy reasoning Petri net
    Wu, Jianing
    Yan, Shaoze
    Xie, Liyang
    ACTA ASTRONAUTICA, 2011, 69 (11-12) : 960 - 968
  • [38] A Bayesian Network Modelling and Risk Analysis on LNG Carrier Anchoring System
    Zhao, Suping
    Zhu, Hanhua
    Soares, Carlos Guedes
    3RD INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS 2015), 2015, : 432 - 436
  • [39] Increasing the reliability of an industrial cold production system using Fault Tree Analysis (FTA)
    Stan, Mihail-Florin
    Fidel, Nicolae
    Mina, Ionut
    Cobianu, Cosmin
    PROCEEDINGS OF THE 2018 10TH INTERNATIONAL CONFERENCE ON ELECTRONICS, COMPUTERS AND ARTIFICIAL INTELLIGENCE (ECAI), 2018,
  • [40] The synthesis of human-error analysis using the cognitive reliability and error analysis method and fault-tree analysis
    Zupancic, J
    Marn, J
    STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 2002, 48 (08): : 418 - 437