An Analytical Model to Evaluate Short- and Long-Term Performances of Post-Tensioned Concrete Box-Girder Bridges Rehabilitated by an Ultrahigh-Performance Concrete Overlay

被引:4
|
作者
Zhang, Youyou [1 ]
Chai, Y. H. [1 ]
机构
[1] Xi An Jiao Tong Univ, Dept Civil Engn, Xian 710049, Peoples R China
关键词
Post-tensioned concrete box-girder bridge; Ultrahigh-performance concrete (UHPC); Deck rehabilitation; Deck overlay; Analytical model; Time-dependent behavior; Creep; Shrinkage; Load-balancing method; The age-adjusted effective modulus method (AEMM); TIME-DEPENDENT BEHAVIOR; 1ST APPLICATION; BOND STRENGTH; UHPC; UHPFRC; BEAMS; ROAD;
D O I
10.1061/JBENF2.BEENG-5673
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Potentially unfavorable stress redistributions could occur in post-tensioned concrete box-girder bridges upon deck rehabilitation by an ultrahigh-performance concrete (UHPC) overlay. The reason for such redistributions is that the deck forms an integral part of the load-resisting mechanism so that deck rehabilitation, namely, the process of removing the deteriorated deck and casting a fresh UHPC overlay, may cause large stress redistributions in the box girder. In addition, the significantly different shrinkage behavior between the freshly cast UHPC deck overlay and the old existing concrete deck below would result in restrained stress in the UHPC-old concrete interface. Therefore, how to evaluate the stress redistributions and the potentially unfavorable stresses in the box girder resulting from construction operations and the incompatible shrinkage is a crucial issue. Here, we propose an analytical model to assess the short- and long-term performances of the concrete box girder during and after deck rehabilitation. The analytical model was verified by using finite-element models incorporating the staged construction simulation and time-dependent behavior of materials. The model can be easily established and calculated with a great amount of time-saving compared with finite-element modeling, and it applies to different types of post-tensioned concrete box-girder bridges. The analytical model involves the balancing-load concept and the age-adjusted effective modulus method (AEMM). The balancing-load concept in the short-term analysis is to account for the prestressing force, and the AEMM in the time-dependent analysis is an effective tool to determine how stresses and strains vary with time due to the creep and shrinkage of a UHPC deck overlay. A parametric study was then conducted based on the analytical model, which involved the thickness of the deck layer to be rehabilitated and the addition of steel reinforcement in the new UHPC deck overlay. Analysis results indicated that pronounced tensile stresses developed in the UHPC deck overlay, which resulted from the restraint of the free shrinkage of the UHPC overlay by the subjacent concrete deck. An increase in the thickness of the newly cast UHPC deck overlay resulted in a decrease of the tensile stress in the UHPC deck overlay, and a rehabilitation thickness of 3.8-5.1 cm (1.5-2.0 in.) was deemed appropriate for the selected bridge according to the analysis.
引用
收藏
页数:17
相关论文
共 18 条
  • [1] Assessment and strengthening of post-tensioned concrete box-girder bridges
    Stroscio R.
    Malik A.
    Turlier F.
    Structural Engineer, 2023, 101 (09): : 8 - 13
  • [2] Crack-based serviceability assessment of post-tensioned segmental concrete box-girder bridges
    He, Zhi-Qi
    Li, Yonghui
    Xu, Tian
    Liu, Zhao
    Ma, Zhongguo John
    STRUCTURES, 2021, 30 : 1097 - 1108
  • [3] Hybrid harmony search for sustainable design of post-tensioned concrete box-girder pedestrian bridges
    Garcia-Segura, Tatiana
    Yepes, Victor
    Alcala, Julian
    Perez-Lopez, Eloy
    ENGINEERING STRUCTURES, 2015, 92 : 112 - 122
  • [4] Action effects in post-tensioned concrete box-girder bridges obtained from high-frequency monitoring
    Mark A. Treacy
    Eugen Brühwiler
    Journal of Civil Structural Health Monitoring, 2015, 5 (1) : 11 - 28
  • [5] Precast versus cast in-situ concrete in the construction of post-tensioned box-girder bridges: Span effect
    Haider, Muhammad A.
    Batikha, Mustafa
    Elhag, Taha
    STRUCTURAL CONCRETE, 2020, 21 (01) : 56 - 64
  • [6] Action effects in post-tensioned concrete box-girder bridges obtained from high-frequency monitoring
    Treacy, Mark A.
    Bruehwiler, Eugen
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2015, 5 (01) : 11 - 28
  • [7] Modeling for Assessment of Long-Term Behavior of Prestressed Concrete Box-Girder Bridges
    Huang, Haidong
    Huang, Shan-Shan
    Pilakoutas, Kypros
    JOURNAL OF BRIDGE ENGINEERING, 2018, 23 (03)
  • [8] Life-Cycle Assessment: A Comparison between Two Optimal Post-Tensioned Concrete Box-Girder Road Bridges
    Penades-Pla, Vicent
    Marti, Jose V.
    Garcia-Segura, Tatiana
    Yepes, Victor
    SUSTAINABILITY, 2017, 9 (10)
  • [9] Long-term behavior of segmentally-erected prestressed concrete box-girder bridges
    Hedjazi, S
    Rahai, A
    Sennah, K
    STRUCTURAL ENGINEERING AND MECHANICS, 2005, 20 (06) : 673 - 693
  • [10] Multiobjective optimization of post-tensioned concrete box-girder road bridges considering cost, CO2 emissions, and safety
    Garcia-Segura, Tatiana
    Yepes, Victor
    ENGINEERING STRUCTURES, 2016, 125 : 325 - 336