Self-reconfiguration and rescheduling of aero-engine assembly shop with rework disruption in knowledgeable manufacturing environment

被引:2
作者
Yan, Hong-Sen [1 ,2 ]
Wan, Xiao-Qin [1 ,2 ,3 ]
机构
[1] Southeast Univ, MOE Key Lab Measurement & Control Complex Syst En, Nanjing, Jiangsu, Peoples R China
[2] Southeast Univ, Sch Automat, 2 Sipailou, Nanjing 210096, Jiangsu, Peoples R China
[3] Nanjing Univ Informat Sci & Technol, Sch Management Sci & Engn, Nanjing, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Knowledgeable manufacturing; self-reconfiguration; assembly job shop; rescheduling; aero-engine; rework; DISPATCHING RULES; JOB-SHOP; WEIGHTED EARLINESS; SEARCH ALGORITHM; OPTIMIZATION; PERFORMANCE; TARDINESS; STABILITY; JOBSHOPS; FLOWTIME;
D O I
10.1177/09544054221123470
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An aero-engine has to be assembled twice or more to satisfy stringent technical standards. Substandard engines are required to re-enter for additional reassembly, which may trigger rework disruption. Work groups with flexible skills are responsible for the operations and can be reassigned when rescheduling triggers. An integrated problem of rescheduling of engines and reconfiguration of work groups with rework disruption is formulated here. A heuristic is proposed to solve the problem. In self-reconfiguration optimization, work groups are reassigned in accordance with the workload balance criterion without violating the assembly skills constraints. In rescheduling optimization, locally optimal sequencing propositions of operations are derived and applied to generate a feasible schedule. Three neighborhood structures are defined, and a variable neighborhood search is implemented to optimize the assignment and the schedule of operations on parallel work groups. The effectiveness of the proposed algorithm is tested by several numerical experiments. The results show that the proposed algorithm promises apparently lower total cost and more desirable assignment of work groups by scheduling.
引用
收藏
页码:1230 / 1240
页数:11
相关论文
共 52 条
[1]   PRIORITY ASSIGNMENT PROCEDURES IN MULTILEVEL ASSEMBLY JOB SHOPS [J].
ADAM, NR ;
BERTRAND, JWM ;
SURKIS, J .
IIE TRANSACTIONS, 1987, 19 (03) :317-328
[2]   Improving schedule stability in single-machine rescheduling for new operation insertion [J].
Akkan, Can .
COMPUTERS & OPERATIONS RESEARCH, 2015, 64 :198-209
[3]   Optimal Assembly Sequence generation through computational approach [J].
Bahubalendruni, M. V. A. Raju ;
Gulivindala, Anil Kumar ;
Varupala, S. S. V. Prasad ;
Palavalasa, Dileep Kumar .
SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2019, 44 (08)
[4]   A hybrid conjugated method for assembly sequence generation and explode view generation [J].
Bahubalendruni, M. V. A. Raju ;
Gulivindala, Anil ;
Kumar, Manish ;
Biswal, Bibhuti Bhusan ;
Annepu, Lakshumu Naidu .
ASSEMBLY AUTOMATION, 2019, 39 (01) :211-225
[5]   An intelligent approach towards optimal assembly sequence generation [J].
Bahubalendruni, M. V. A. Raju ;
Biswal, Bibhuti Bhusan .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2018, 232 (04) :531-541
[6]   Liaison concatenation - A method to obtain feasible assembly sequences from 3D-CAD product [J].
Bahubalendruni, M. V. A. Raju ;
Biswal, Bibhuti Bhusan .
SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2016, 41 (01) :67-74
[7]   Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem [J].
Bouffard, Veronique ;
Ferland, Jacques A. .
JOURNAL OF SCHEDULING, 2007, 10 (06) :375-386
[8]   An improved backtracking search algorithm for the flexible job shop rescheduling problem with new job insertions [J].
Caldeira, Rylan H. ;
Gnanavelbabu, A. .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2022, 16 (01) :41-70
[9]   Synchronisation of production scheduling and shipment in an assembly flowshop [J].
Chen, Jian ;
Huang, George Q. ;
Luo, Hao ;
Wang, Junqiang .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) :2787-2802
[10]   Optimisation for multi-part flow-line configuration of reconfigurable manufacturing system using GA [J].
Dou, Jianping ;
Dai, Xianzhong ;
Meng, Zhengda .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (14) :4071-4100