Thermo-economic analysis of a waste-to-energy assisted carbon capture system for a coal-fired power plant

被引:5
作者
Wang, Yinan [1 ]
Chen, Heng [1 ]
Li, Tongyu [1 ]
Pan, Peiyuan [1 ]
Zhai, Rongrong [1 ]
Xu, Gang [1 ]
Dong, Yuehong [2 ]
Zhou, Zunkai [3 ]
机构
[1] North China Elect Power Univ, Natl Thermal Power Engn & Technol Res Ctr, Beijing 102206, Peoples R China
[2] China Energy Sci & Technol Res Inst Co Ltd, State Key Lab Clean & Efficient Coal Fired Power G, Nanjing 210023, Peoples R China
[3] POWER CHINA Fujian Elect Power Engn Co Ltd, Fuzhou 350003, Peoples R China
基金
中国国家自然科学基金;
关键词
Waste-to-energy plant; Coal-fired power plant; Carbon capture and storage; Hybrid power generation system; Waste heat recovery; ECONOMIC-ANALYSIS; HEAT-RECOVERY; INCINERATION; EXERGY; CHINA; EFFICIENCY; INDUSTRY;
D O I
10.1016/j.applthermaleng.2023.120594
中图分类号
O414.1 [热力学];
学科分类号
摘要
An advanced energy system was proposed that hybridizes a waste-to-energy plant and a coal-fired power plant accompanied by a carbon capture and storage system. Compared with previous similar systems, the innovations of this system include: (1) a new approach to municipal solid waste energy use was proposed: energy supply for carbon capture and storage systems; (2) the heat integration design of the novel system was conducted based on the principle of energy cascade utilization, and high energy efficiency was achieved; (3) the equipment of the waste-to-energy plant is streamlined due to system integration, reducing investment costs. The main parameters of several existing reference systems were collected, and the benefits of the proposed systems were analyzed, compared and evaluated in terms of energy, exergy and economy. The results show that the net electric efficiency of the integrated system is improved by 1.75%, the electricity generation is increased by 14.37 MW, and at a discount rate of 5%, the dynamic payback period of the waste-to-energy system can be advanced by about 2.34 years. These indicators demonstrate the engineering potential of the proposed system and can be used as a reference for similar investment projects.
引用
收藏
页数:18
相关论文
共 48 条
  • [1] [Anonymous], 2022, ELECT PRICE HIKE POW
  • [2] Awasthi S.K., 2022, FUEL GUILDFORD, P317
  • [3] Energy and exergy analyses of a mass-fired boiler for a proposed waste-to-energy power plant in Tehran
    Azami, Sina
    Taheri, Mina
    Pourali, Omid
    Torabi, Farschad
    [J]. APPLIED THERMAL ENGINEERING, 2018, 140 : 520 - 530
  • [4] Multi-objective optimization and exergoeconomic analysis of waste heat recovery from Tehran's waste-to-energy plant integrated with an ORC unit
    Behzadi, Amirmohammad
    Gholamian, Ehsan
    Houshfar, Ehsan
    Habibollahzade, Ali
    [J]. ENERGY, 2018, 160 : 1055 - 1068
  • [5] Repowering existing under-utilized WTE power plant with gas turbines
    Bianchi, Michele
    Branchini, Lisa
    Cesari, Simone
    De Pascale, Andrea
    Melino, Francesco
    [J]. APPLIED ENERGY, 2015, 160 : 902 - 911
  • [6] Performance analysis and operation strategy of an improved waste-to-energy system incorporated with a coal-fired power unit based on feedwater heating
    Chen, Heng
    Zhang, Meiyan
    Chen, Zhidong
    Xu, Gang
    Han, Wei
    Liu, Wenyi
    Liu, Tong
    [J]. APPLIED THERMAL ENGINEERING, 2020, 178 (178)
  • [7] Design and performance evaluation of a new waste incineration power system integrated with a supercritical CO2 power cycle and a coal-fired power plant
    Chen, Heng
    Zhang, Meiyan
    Wu, Yunyun
    Xu, Gang
    Liu, Wenyi
    Liu, Tong
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2020, 210 (210)
  • [8] An innovative waste-to-energy system integrated with a coal-fired power plant
    Chen, Heng
    Zhang, Meiyan
    Xue, Kai
    Xu, Gang
    Yang, Yongping
    Wang, Zepeng
    Liu, Wenyi
    Liu, Tong
    [J]. ENERGY, 2020, 194
  • [9] China Electricity Council, CHIN EL COUNC REL CH
  • [10] China Merchants bank, 2015, BENCHM INT RAT RMB L