Malleable scheduling beyond identical machines

被引:2
|
作者
Fotakis, Dimitris [1 ]
Matuschke, Jannik [2 ]
Papadigenopoulos, Orestis [3 ]
机构
[1] Natl Tech Univ Athens, Sch Elect & Comp Engn, Athens, Greece
[2] Katholieke Univ Leuven, Res Ctr Operat Management, Leuven, Belgium
[3] Univ Texas Austin, Dept Comp Sci, Austin, TX 78712 USA
关键词
Malleable; Scheduling; Packing; Jobs; Machines; Parallel; Makespan; Unrelated; Uniform; Restricted; Moldable; Rounding; Approximation; APPROXIMATION ALGORITHM; TASKS;
D O I
10.1007/s10951-022-00733-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In malleable job scheduling, jobs can be executed simultaneously on multiple machines with the processing time depending on the number of allocated machines. In this setting, jobs are required to be executed non-preemptively and in unison, in the sense that they occupy, during their execution, the same time interval over all the machines of the allocated set. In this work, we study generalizations of malleable job scheduling inspired by standard scheduling on unrelated machines. Specifically, we introduce a general model of malleable job scheduling, where each machine has a (possibly different) speed for each job, and the processing time of a job j on a set of allocated machines S depends on the total speed of S with respect to j. For machines with unrelated speeds, we show that the optimal makespan cannot be approximated within a factor less than e/e-1, unless P = NP. On the positive side, we present polynomial-time algorithms with approximation ratios 2e/e-1 for machines with unrelated speeds, 3 for machines with uniform speeds, and 7/3 for restricted assignments on identical machines. Our algorithms are based on deterministic LP rounding. They result in sparse schedules, in the sense that each machine shares at most one job with other machines. We also prove lower bounds on the integrality gap of 1 +phi for unrelated speeds (phi is the golden ratio) and 2 for uniform speeds and restricted assignments. To indicate the generality of our approach, we show that it also yields constant factor approximation algorithms for a variant where we determine the effective speed of a set of allocated machines based on the L-p norm of their speeds.
引用
收藏
页码:425 / 442
页数:18
相关论文
共 50 条
  • [31] Scheduling and packing malleable and parallel tasks with precedence constraints of bounded width
    Elisabeth Günther
    Felix G. König
    Nicole Megow
    Journal of Combinatorial Optimization, 2014, 27 : 164 - 181
  • [32] Minimizing total tardiness for scheduling identical parallel machines with family setups
    Schaller, Jeffrey E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 72 : 274 - 281
  • [33] Fair scheduling on parallel batch machines with non-identical capacities
    Zhang, Cui-Lin
    Fan, Guo-Qiang
    Wang, Jun-Qiang
    ENGINEERING OPTIMIZATION, 2024,
  • [34] Conditional Hardness of Precedence Constrained Scheduling on Identical Machines
    Svensson, Ola
    STOC 2010: PROCEEDINGS OF THE 2010 ACM SYMPOSIUM ON THEORY OF COMPUTING, 2010, : 745 - 754
  • [35] Scheduling identical parallel machines to minimize total tardiness
    Biskup, Dirk
    Herrmann, Jan
    Gupta, Jatinder N. D.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (01) : 134 - 142
  • [36] Order acceptance and scheduling on two identical parallel machines
    Wang, Xiuli
    Huang, Guodong
    Hu, Xiuwu
    Cheng, T. C. Edwin
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (10) : 1755 - 1767
  • [37] Approximating Real-Time Scheduling on Identical Machines
    Bansal, Nikhil
    Rutten, Cyriel
    van der Ster, Suzanne
    Vredeveld, Tjark
    van der Zwaan, Ruben
    LATIN 2014: THEORETICAL INFORMATICS, 2014, 8392 : 550 - 561
  • [38] Scheduling identical jobs on uniform machines with a conflict graph
    Mallek, Amin
    Bendraouche, Mohamed
    Boudhar, Mourad
    COMPUTERS & OPERATIONS RESEARCH, 2019, 111 : 357 - 366
  • [39] Online Splitting Interval Scheduling on m Identical Machines
    Zheng, Feifeng
    Liu, Bo
    Xu, Yinfeng
    Zhang, E.
    ALGORITHMIC ASPECTS IN INFORMATION AND MANAGEMENT, 2010, 6124 : 304 - +
  • [40] Scheduling on parallel identical machines to minimize total tardiness
    Shim, Sang-Oh
    Kim, Yeong-Dae
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 177 (01) : 135 - 146