Urban waterlogging structure risk assessment and enhancement

被引:8
作者
Ding, Yi [1 ]
Wang, Hao [1 ]
Liu, Yan [2 ]
Lei, Xiaohui [3 ]
机构
[1] Beijing Univ Technol, Fac Architecture Civil & Transportat Engn, Beijing 100124, Peoples R China
[2] Tianjin Univ, State Key Lab Hydraul Engn Simulat & Safety, Tianjin 300072, Peoples R China
[3] China Inst Water Resources & Hydropower Res, State Key Lab Simulat & Regulat Water Cycle River, Beijing 100038, Peoples R China
关键词
Urban waterlogging risk assessment; Structure of urban waterlogging; Urban stormwater control; Vehicle-mounted drainage pump solutions; FLOOD; IMPACT; CITY; INFRASTRUCTURE; EVENTS; DESIGN; GREEN; MODEL;
D O I
10.1016/j.jenvman.2024.120074
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Urban waterlogging patches reflect spatial patterns indicative of drainage system limitations and management challenges, and help pinpoint potential waterlogging impacts and spread risks. Therefore, by constructing an urban waterlogging model to simulate the extent and depth of waterlogging, the Number of Patches index (NP) is used to reflect the number of waterlogging patches, the Related Circumscribing Circle index (Circle) is used to evaluate the potential impact range of waterlogging, the Euclidean Nearest-Neighbor Distance index (ENN) is used to assess the potential connectivity of waterlogging, and the Interspersion and Juxtaposition Index (IJI) is used to assess the difficulty of retrofitting vulnerable points. Finally, the improvement of waterlogging structure is achieved by utilizing Vehicle-mounted Drainage Pump (VDPs). The research results demonstrate that as the return period increases, the waterlogging area (TA) and NP index show an upward trend, while the ENN index shows a downward trend. The Circle index initially decreases and then increases, reaching its lowest point at a one-year return period (1yr). The IJI index is related to the growth of TA, and in the two-year return period (2yr) and fifty-year return period (50yr) design scenarios, both TA and IJI indexshow significant growth. After the deployment of VDPs, the maximum area of waterlogging elimination reaches 0.46 km2 at a five-year return period (5yr). The drainage system reaches its drainage limit at 2yr, and the VDPs achieves its drainage limit at 5yr. The NP index does not decrease significantly, but in the case of a 5yr, the high-density area decreases by 1.66 km2. The Circle index values decrease across the board, and in the case of a 5yr, the potential impact range decreases by 1.92 km2, with 134 roads restored for traffic. The change in the ENN index decreased from 23.35 to 0.82, indicating that the spread of waterlogging can be more effectively controlled at lower return periods. The changes in the IJI index are more complex, with negative adjustments between 5 and 20yr, reducing the degree of mixing of different levels of waterlogging in the remaining return periods. Overall, with the increase of rainfall return period, the waterlogging area increases, the number of patches increases, the shape becomes irregular, the distance between patches decreases, and the potential connectivity increases. After the deployment of VDPs, the system integrity is improved, the waterlogging impact range is reduced, the impact on pedestrians and facilities is mitigated, and the risk of pollutant propagation and expansion of waterlogging area is reduced. This study contributes to reducing the potential risk of waterlogging, improving urban drainage effectiveness, and enhancing the resilience and emergency response capability of cities.
引用
收藏
页数:17
相关论文
共 63 条
  • [51] Shah SMH, 2018, J TEKNOL, V80, P25
  • [52] Approaches to Multi-Objective Optimization and Assessment of Green Infrastructure and Their Multi-Functional Effectiveness: A Review
    Wang, Jia
    Liu, Jiahong
    Wang, Hao
    Mei, Chao
    [J]. WATER, 2020, 12 (10)
  • [53] A review and perspective for research on moisture damage in asphalt pavement induced by dynamic pore water pressure
    Wang, Wentao
    Wang, Linbing
    Xiong, Haocheng
    Luo, Rong
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2019, 204 : 631 - 642
  • [54] Numerical assessment of flood hazard risk to people and vehicles in flash floods
    Xia, Junqiang
    Falconer, Roger A.
    Lin, Binliang
    Tan, Guangming
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2011, 26 (08) : 987 - 998
  • [55] Integrated Risk Assessment of Waterlogging in Guangzhou Based on Runoff Modeling, AHP, GIS and Scenario Analysis
    Xie, Shuai
    Liu, Wan
    Yuan, Zhe
    Zhang, Hongyun
    Lin, Hang
    Wang, Yongqiang
    [J]. WATER, 2022, 14 (18)
  • [56] Study on urban flood simulation based on a novel model of SWTM coupling D8 flow direction and backflow effect
    Yang, Weichao
    Zheng, Chuanxing
    Jiang, Xuelian
    Wang, Hao
    Lian, Jijian
    Hu, De
    Zheng, Airong
    [J]. JOURNAL OF HYDROLOGY, 2023, 621
  • [57] Urban drainage system planning and design - challenges with climate change and urbanization: a review
    Yazdanfar, Zeinab
    Sharma, Ashok
    [J]. WATER SCIENCE AND TECHNOLOGY, 2015, 72 (02) : 165 - 179
  • [58] Evaluating the impact and risk of pluvial flash flood on intra-urban road network: A case study in the city center of Shanghai, China
    Yin, Jie
    Yu, Dapeng
    Yin, Zhane
    Liu, Min
    He, Qing
    [J]. JOURNAL OF HYDROLOGY, 2016, 537 : 138 - 145
  • [59] Study on urban flood early warning system considering flood loss
    Zang, Yawen
    Meng, Yu
    Guan, Xinjian
    Lv, Hong
    Yan, Denghua
    [J]. INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION, 2022, 77
  • [60] A bibliometric analysis of the research on Sponge City: Current situation and future development direction
    Zha, Xianbao
    Luo, Pingping
    Zhu, Wei
    Wang, Shuangtao
    Lyu, Jiqiang
    Zhou, Meimei
    Huo, Aidi
    Wang, Zhenhong
    [J]. ECOHYDROLOGY, 2021, 14 (07)