Research on the risk evaluation of urban wastewater treatment projects based on an improved fuzzy cognitive map

被引:19
作者
Chen, Hongyu [1 ]
Wang, Jingyi [2 ]
Feng, Zongbao [2 ]
Liu, Yang [3 ,4 ]
Xu, Wen [2 ]
Qin, Yawei [2 ,5 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong 999077, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, Wuhan 430074, Hubei, Peoples R China
[3] Wuhan Univ, ZhongNan Hosp, Wuhan 430071, Peoples R China
[4] Wuhan Univ, Sch Econ & Management, Wuhan 430072, Peoples R China
[5] Wuhan Huazhong Univ Sci & Technol, Test Technol Co Ltd, Wuhan 430074, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Urban wastewater treatment; Public-private partnership projects; Risk evaluation; Improved Fuzzy Cognitive Map; Evidence -Based Reasoning; PUBLIC-PRIVATE PARTNERSHIP; EVIDENTIAL REASONING RULE; PPP; CHINA; MANAGEMENT; IMPACT;
D O I
10.1016/j.scs.2023.104796
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To address the issues of ambiguous uncertainty and conflicting evidence in risk evaluation of wastewater treatment public-private partnership (PPP) project, a risk evaluation approach based on an evidence-based reasoning (ER)-improved fuzzy cognitive map (FCM) and 15 secondary evaluation indexes system are pro-posed. Then, ER is used to fuse expert opinions to obtain a correlation matrix. Finally, the rank evaluation results are obtained by FCM inference. External environmental risk (S), investment and financing risk (F) are the risk factors that have the greatest impact and sensitiveness on PPP wastewater treatment projects. For predictive analysis, the maximum project risk value was 0.5523 when the S value was set to 1, followed by the project risk value when the F value was set to 1. For diagnostic analysis, the greatest change in S value converged to 0.4978 when all risk factors were set to a neutral value of 0.5, while the greatest change in project risk was observed when all risk factors were set to 1. In addition, policy and legal risk, economic risk and market risk are the most sensitive risk factors among all secondary risk factors. The results are able to provide reliable project risk assessment solutions for project decision makers.
引用
收藏
页数:17
相关论文
共 73 条
[1]   Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success [J].
Ahmadabadi, Ali Akbari ;
Heravi, Gholamreza .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2019, 124 :169-188
[2]   A holistic review of research studies on financial risk management in public-private partnership projects [J].
Akomea-Frimpong, Isaac ;
Jin, Xiaohua ;
Osei-Kyei, Robert .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) :2549-2569
[3]   Analysis of biogas produced by the anaerobic digestion of sludge generated at wastewater treatment plants in the South of Minas Gerais, Brazil as a potential energy source [J].
Alves Feica, Aline Tathyana ;
Barros, Regina Mambeli ;
Tiago Filho, Geraldo Lucio ;
Silva dos Santos, Ivan Felipe ;
Ribeiro, Eruin Martuscelli .
SUSTAINABLE CITIES AND SOCIETY, 2018, 41 :139-153
[4]   Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach [J].
Ameyaw, Effah Ernest ;
Chan, Albert P. C. .
EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) :5102-5116
[5]   Critical Success Factors for Sustainable Public-Private Partnership (PPP) in Transition Conditions: An Empirical Study in Bosnia and Herzegovina [J].
Amovic, Goran ;
Maksimovic, Rado ;
Buncic, Sonja .
SUSTAINABILITY, 2020, 12 (17)
[6]   Artificial Life Environment Modeled by Dynamic Fuzzy Cognitive Maps [J].
Arruda, Lucia Valeria R. ;
Mendonca, Marcio ;
Neves, Flavio, Jr. ;
Chrun, Ivan Rossato ;
Papageorgiou, Elpiniki I. .
IEEE TRANSACTIONS ON COGNITIVE AND DEVELOPMENTAL SYSTEMS, 2018, 10 (01) :88-101
[7]   A scenario simulation approach for sustainable mobility project evaluation based on fuzzy cognitive maps [J].
Awasthi, Anjali ;
Omrani, Hichem .
INTERNATIONAL JOURNAL OF MODELLING AND SIMULATION, 2018, 38 (04) :262-272
[8]   Major Obstacles to Public-Private Partnership (PPP)-Financed Infrastructure Development in China [J].
Bashar, Toriqul ;
Fung, Ivan W. H. ;
Jaillon, Lara Celine ;
Di Wang .
SUSTAINABILITY, 2021, 13 (12)
[9]   Study on power consumption load forecast based on K-means clustering and FCM-BP model [J].
Bian Haihong ;
Zhong Yiqun ;
Sun Jianshuo ;
Shi Fangchu .
ENERGY REPORTS, 2020, 6 :693-700
[10]   Risk management by SPV partners in toll road public private partnerships [J].
Burke, Richard ;
Demirag, Istemi .
PUBLIC MANAGEMENT REVIEW, 2019, 21 (05) :711-731