EFFICIENT APPROXIMATE ALGORITHMS FOR A CLASS OF DYNAMIC LOT SIZE PROBLEMS UNDER PRODUCT SUBSTITUTION

被引:2
作者
Huang, Shanming [1 ]
Xue, Feng [1 ]
Yang, Wanshuo [2 ]
机构
[1] Univ Elect Sci & Technol China, Sch Management & Econ, Chengdu 611731, Peoples R China
[2] Chongqing Univ, Coll Math & Stat, Chongqing 401331, Peoples R China
关键词
Dynamic lot sizing; product substitution; perishable inventory; DEMAND SUBSTITUTION; FORECAST HORIZONS; SIZING PROBLEM; ONE-WAY; INVENTORY; MODEL; POLICIES; MANAGEMENT;
D O I
10.3934/jimo.2023082
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Our investigation into the production substitution between prod-ucts is motivated by a significant issue faced by firms in practice: the effective balance of setup and substitution cost. Given that firms can adjust an oper-ation policy to lower the setup and substitution costs or both, the operation manager should also know how best to make the adjustment. Thus, in this study, we consider a class of dynamic lot sizing problems with one-way and two-way product substitution modes under durable and perishable products. According to some structural properties in an optimal solution, we devise a for-ward dynamic programming (DP) algorithm to work out the problem with two durable products in a polynomial time. Then, we develop an efficient approx-imate DP algorithm to solve the problem with multiple perishable products. Finally, on a comprehensive test bed, we gain some useful insights on the im-pact of substitution on the total costs. We also tested the effectiveness of the approximate algorithm.
引用
收藏
页码:368 / 391
页数:24
相关论文
共 40 条
[1]   A bilinear programming model and a modified branch-and-bound algorithm for production planning in steel rolling mills with substitutable demand [J].
As'ad, Rami ;
Demirli, Kudret .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) :3731-3749
[2]   Production scheduling in steel rolling mills with demand substitution: Rolling horizon implementation and approximations [J].
As'ad, Rami ;
Demirli, Kudret .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 126 (02) :361-369
[3]  
Balakrishnan A., 2000, Manufacturing & Service Operations Management, V2, P166, DOI 10.1287/msom.2.2.166.12349
[4]   Forecast and rolling horizons under demand substitution and production changeovers: analysis and insights [J].
Bardhan, Amit ;
Dawande, Milind ;
Gavirneni, Srinagesh ;
Mu, Yinping ;
Sethi, Suresh .
IIE TRANSACTIONS, 2013, 45 (03) :323-340
[5]   A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem [J].
Blocher, JD ;
Chand, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (03) :456-470
[6]   An economic lot-sizing problem with perishable inventory and economies of scale costs: Approximation solutions and worst case analysis [J].
Chu, LY ;
Hsu, VN ;
Shen, ZJM .
NAVAL RESEARCH LOGISTICS, 2005, 52 (06) :536-548
[7]  
Dawande M., 2006, Journal of Mathematical Modelling and Algorithms, V5, P239, DOI [https://doi.org/10.1007/s10852-005-9012-3, DOI 10.1007/S10852-005-9012-3]
[8]   Forecast horizons for a class of dynamic lot-size problems under discrete future demand [J].
Dawande, Milind ;
Gavirneni, Srinagesh ;
Naranpanawe, Sanjeewa ;
Sethi, Suresh .
OPERATIONS RESEARCH, 2007, 55 (04) :688-702
[9]   On the Interaction Between Demand Substitution and Production Changeovers [J].
Dawande, Milind ;
Gavirneni, Srinagesh ;
Mu, Yinping ;
Sethi, Suresh ;
Sriskandarajah, Chelliah .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2010, 12 (04) :682-691
[10]   Discrete forecast horizons for two-product variants of the dynamic lot-size problem [J].
Dawande, Milind ;
Gavirneni, Srinagesh ;
Naranpanawe, Sanjeewa ;
Sethi, Suresh R. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :430-436