共 50 条
- [41] Intelligent scheduling and optimisation for resource-constrained networks IET CONTROL THEORY AND APPLICATIONS, 2010, 4 (12): : 2982 - 2992
- [43] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
- [45] Flexible resource-constrained resource leveling project scheduling problem Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
- [48] Resource-constrained project scheduling - Minimization of project duration PROJECT SCHEDULING WITH TIME WINDOWS AND SCARCE RESOURCES, 2002, 508 : 21 - 174