An iterative auction for resource-constrained surgical scheduling

被引:5
|
作者
Liu, Lu [1 ]
Wang, Chun [2 ]
Wang, Jian-Jun [3 ]
Crespo, Antonio Marcio Ferreira [2 ]
机构
[1] Zhejiang Univ Technol, Hangzhou, Peoples R China
[2] Concordia Univ, Montreal, PQ, Canada
[3] Dalian Univ Technol, Dalian, Peoples R China
基金
中国国家自然科学基金; 加拿大自然科学与工程研究理事会;
关键词
Scheduling; operation room; auction; resource-constrained; OPERATING-THEATER; DECISION-MAKING;
D O I
10.1080/01605682.2022.2083988
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a decentralized surgical scheduling problem with conflicting multiple renewable resources requirements under surgeon's private availability restriction. The objective of the surgical scheduling planner is to maximize the weighted sum of the number of potential selected surgeries. Due to the information asymmetry and the efforts taken by self-interest decision makers to maximize their own benefits, the coordination between the surgical schedule planner and surgeons for achieving efficient scheduling is difficult. In order to solve the decentralized surgical scheduling problem, we propose an auction mechanism in which surgeons only need to submit partial availability information when necessary. In the mechanism, surgeons submit bids based on their availability and renewable resources requirements for performing a surgery, while the winner determination model is formulated to select bids when the termination condition of the iterative bidding procedure is not satisfied. Under the proposed mechanism, we prove that myopic bidding is surgeons' weakly dominant strategy. The results of our computational experiments also show that the proposed mechanism can achieve high efficiency compared with optimal solutions on different supply-demand ratio configurations. We also observed that the privacy loss incurred during the bidding process is negatively correlated to the supply-demand ratio.
引用
收藏
页码:968 / 978
页数:11
相关论文
共 50 条
  • [31] Influence of learning in resource-constrained project scheduling
    Van Peteghem, Vincent
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 569 - 579
  • [32] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [33] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [34] Approximate solution of a resource-constrained scheduling problem
    Renaud Sirdey
    Jacques Carlier
    Dritan Nace
    Journal of Heuristics, 2009, 15 : 1 - 17
  • [35] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [36] Resource-Constrained Scheduling for Digital Microfluidic Biochips
    O'Neal, Kenneth
    Grissom, Daniel
    Brisk, Philip
    ACM JOURNAL ON EMERGING TECHNOLOGIES IN COMPUTING SYSTEMS, 2018, 14 (01)
  • [37] RESOURCE-CONSTRAINED JOB SCHEDULING WITH RECYCLABLE RESOURCES
    SHEWCHUK, JP
    CHANG, TC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) : 364 - 375
  • [38] CROSS cyclic resource-constrained scheduling solver
    Bonfietti, Alessio
    Lombardi, Michele
    Benini, Luca
    Milano, Michela
    ARTIFICIAL INTELLIGENCE, 2014, 206 : 25 - 52
  • [39] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [40] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351