An iterative auction for resource-constrained surgical scheduling

被引:5
|
作者
Liu, Lu [1 ]
Wang, Chun [2 ]
Wang, Jian-Jun [3 ]
Crespo, Antonio Marcio Ferreira [2 ]
机构
[1] Zhejiang Univ Technol, Hangzhou, Peoples R China
[2] Concordia Univ, Montreal, PQ, Canada
[3] Dalian Univ Technol, Dalian, Peoples R China
基金
中国国家自然科学基金; 加拿大自然科学与工程研究理事会;
关键词
Scheduling; operation room; auction; resource-constrained; OPERATING-THEATER; DECISION-MAKING;
D O I
10.1080/01605682.2022.2083988
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a decentralized surgical scheduling problem with conflicting multiple renewable resources requirements under surgeon's private availability restriction. The objective of the surgical scheduling planner is to maximize the weighted sum of the number of potential selected surgeries. Due to the information asymmetry and the efforts taken by self-interest decision makers to maximize their own benefits, the coordination between the surgical schedule planner and surgeons for achieving efficient scheduling is difficult. In order to solve the decentralized surgical scheduling problem, we propose an auction mechanism in which surgeons only need to submit partial availability information when necessary. In the mechanism, surgeons submit bids based on their availability and renewable resources requirements for performing a surgery, while the winner determination model is formulated to select bids when the termination condition of the iterative bidding procedure is not satisfied. Under the proposed mechanism, we prove that myopic bidding is surgeons' weakly dominant strategy. The results of our computational experiments also show that the proposed mechanism can achieve high efficiency compared with optimal solutions on different supply-demand ratio configurations. We also observed that the privacy loss incurred during the bidding process is negatively correlated to the supply-demand ratio.
引用
收藏
页码:968 / 978
页数:11
相关论文
共 50 条
  • [21] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [22] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [23] An Extended CPM for Resource-constrained Project Scheduling
    Ju, C. H.
    Xie, Y.
    ULTRA-PRECISION MACHINING TECHNOLOGIES, 2009, 69-70 : 695 - 699
  • [24] A Practical Approach for Resource-Constrained Project Scheduling
    Manousakis, Konstantinos
    Savva, Giannis
    Papadouri, Nicos
    Mavrovouniotis, Michalis
    Christofides, Athanasios
    Kolokotroni, Nedi
    Ellinas, Georgios
    IEEE ACCESS, 2024, 12 : 12976 - 12991
  • [25] Resource-constrained formulation for production scheduling and maintenance
    Aguirre, Adrian M.
    Papageorgiou, Lazaros G.
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT B, 2017, 40B : 1375 - 1380
  • [26] RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART
    HERROELEN, WS
    OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) : 261 - +
  • [27] Approximate solution of a resource-constrained scheduling problem
    Sirdey, Renaud
    Carlier, Jacques
    Nace, Dritan
    JOURNAL OF HEURISTICS, 2009, 15 (01) : 1 - 17
  • [28] Resource-constrained scheduling with optional recycling operations
    Lin, Bertrand M. T.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 90 : 39 - 45
  • [29] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [30] Resource-Constrained Scheduling for Maritime Traffic Management
    Agussurja, Lucas
    Kumar, Akshat
    Lau, Hoong Chuin
    THIRTY-SECOND AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE / THIRTIETH INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE / EIGHTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE, 2018, : 6086 - 6093