Capital-constrained maintenance scheduling for road networks considering traffic dynamics

被引:3
|
作者
Mao, Xinhua [1 ,2 ]
Dong, Shi [1 ,2 ]
Wang, Jianwei [1 ,2 ]
Zhou, Jibiao [3 ]
Yuan, Changwei [1 ,2 ]
Zheng, Tao [1 ]
机构
[1] Changan Univ, Coll Transportat Engn, Xian, Peoples R China
[2] Changan Univ, Engn Res Ctr Highway Infrastruct Digitalizat, Minist Educ, Xian, Peoples R China
[3] Tongji Univ, Coll Transportat Engn, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Maintenance scheduling; road network; bi-objective optimization; day-to-day dynamics; NSGA II; BOTTOM-UP SOLUTION; PAVEMENT MAINTENANCE; STOCHASTIC-PROCESS; JOINT OPTIMIZATION; GENETIC ALGORITHM; ROUTE CHOICE; ASSIGNMENT; MODEL; MANAGEMENT; STABILITY;
D O I
10.1080/21680566.2023.2250080
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Road network maintenance scheduling mainly considers budget limits in the previous studies and largely ignores the capital constraints. This study proposes a bi-objective mixed integer programming model, in which the net present value (NPV) is maximized and the increased total system travel time (ITSTT) due to maintenance activities under the capital constraints is minimized. Since the road network flows cannot reach an equilibrium state overnight due to the variation of network capacity, a link-based day-to-day dynamics model is developed to simulate the transient fluctuation in the traffic flows and calculate the total system travel time of each day. The bi-objective model is solved by the nondominated sorting genetic algorithm-II (NSGA-II) that generates a set of optimal Pareto solutions. The TOPSIS method is then adopted to determine the best compromise solution. Finally, a case study is conducted to demonstrate the effects of key parameters on the values of the two objectives.
引用
收藏
页码:1845 / 1870
页数:26
相关论文
共 45 条
  • [1] Maintenance Scheduling Model for Road Networks Considering Payment Modes
    Mao, Xinhua
    Wang, Jianwei
    Yuan, Changwei
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2021, 56 (04): : 736 - 743
  • [2] Multi-mode capital-constrained project payment scheduling model considering bonus-penalty structure
    Vahdani, Hashem
    Shams, Aida
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (01) : 17 - 25
  • [3] Metaheuristics for multi-mode capital-constrained project payment scheduling
    He, Zhengwen
    Liu, Renjing
    Jia, Tao
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 223 (03) : 605 - 613
  • [4] Manufacturing/remanufacturing decisions for a capital-constrained manufacturer considering carbon emission cap and trade
    Wang, Yongjian
    Chen, Weida
    Liu, Biyu
    JOURNAL OF CLEANER PRODUCTION, 2017, 140 : 1118 - 1128
  • [5] Optimal Green Input Level for a Capital-Constrained Supply Chain Considering Disruption Risk
    Cheng, Junheng
    Hong, Weiyi
    Cheng, Jingya
    SUSTAINABILITY, 2023, 15 (15)
  • [6] Accounting for Traffic Dynamics in Pavement Maintenance Scheduling
    Prajapati, Abhishek Kumar
    Sengupta, Agnimitra
    Guler, Sukran Ilgin
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (07) : 361 - 375
  • [7] System dynamics modeling and robustness analysis for capital-constrained supply chain under disruption
    Zhang, Xiaoming
    Shi, Yangyan
    Zhang, Peng
    Xu, Fang
    Jiang, Chaozhe
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2023, 123 (02) : 492 - 514
  • [8] System dynamics modeling and simulation for Capital-constrained Supply Chain based on inventory financing
    Yan, Ni-Na
    Sun, Bao-Wen
    Information Technology Journal, 2013, 12 (24) : 8384 - 8390
  • [9] Smart Traffic Scheduling for Crowded Cities Road Networks
    Alkhatib, Ahmad A. A.
    Abu Maria, Khulood
    AlZu'bi, Shadi
    Abu Maria, Eman
    EGYPTIAN INFORMATICS JOURNAL, 2022, 23 (04) : 163 - 176
  • [10] Pricing and financing strategies of dual channel closed-loop supply chain considering capital-constrained manufacturer
    Xue, Meng
    Wu, Di
    Hu, Haiqing
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (02) : 275 - 301