A Proposed Model for Variation Order Management in Construction Projects

被引:2
作者
Ismaeil, Esam M. H. [1 ,2 ]
Sobaih, Abu Elnasr E. [3 ,4 ]
机构
[1] King Faisal Univ, Coll Engn, Civil & Environm Dept, Al Hasa 31982, Saudi Arabia
[2] Port Said Univ, Fac Engn, Architecture & Urban Planning Dept, Port Said 42526, Egypt
[3] King Faisal Univ, Coll Business Adm, Management Dept, Al Hasa 31982, Saudi Arabia
[4] Helwan Univ, Fac Tourism & Hotel Management, Hotel Management Dept, Cairo 12612, Egypt
关键词
change order; construction projects; Saudi Arabia; variation order; variation order management (VOM); REWORK; IMPACT;
D O I
10.3390/buildings14030726
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study aims to identify the causes of excessive change orders and their impact on public construction projects in Saudi Arabia. This should support the organizations working in the construction industry to improve variation order management (VOM) as a preventive action by dealing proactively with variation order causes. Therefore, a new methodology was proposed to minimize change orders and their impact on the successful completion of projects as well as cost during the project lifecycle. The methodology involved ten selected turnkey building projects at King Faisal University (KFU) campus, Saudi Arabia. Statistical analyses were conducted to predict the cost overrun in project size and contract value. The findings showed the most significant causes leading to variation order in public construction projects. These include the combined effect of the designer and owner technical committee, designer document, and owner stakeholder committee. Hence, a new model for VOM was developed as a best practice approach, including three stages. The first stage is the initiation process, which includes seven procedures, seven tools, and key responsibilities. The second stage deals with the course of change orders based on a certain number of procedures and weight for each parameter assigned to this phase. It supports decision processes based on a certain average ratio of weights calculation. The third stage is the decision to support decision makers in proceeding or not proceeding with the variation order. Although the present study was conducted in Saudi Arabia's public building construction project, it is envisaged that these research results are widely applicable to other developing countries. The paper presents a direction for further research to enhance the impact of cost overrun in public sector construction projects in developing countries, i.e., Saudi Arabia.
引用
收藏
页数:22
相关论文
共 59 条
[41]  
Memon A.H., 2014, Research Journal of Applied Sciences, Engineering and Technology, V7, P4494, DOI [10.19026/rjaset.7.826, DOI 10.19026/RJASET.7.826]
[42]  
Mohammad K.H., 2021, Journal of Engineering, V27, P106, DOI [10.31026/j.eng.2021.02.08, DOI 10.31026/J.ENG.2021.02.08]
[43]  
Mohammad N, 2017, International Journal of Supply Chain Management, V6, P226
[44]  
Msallam M., 2015, Journal of Engineering and Architecture, V3, P95, DOI DOI 10.15640/JEA.V3N2A11
[45]  
Nachatar J.S., 2010, Information Management, University of Malaysia, V12, P40
[46]   The Effect of Change-Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach [J].
Naji, Khalid K. ;
Gunduz, Murat ;
Naser, Ayman F. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (09)
[47]  
Ndihokubwayo R., 2008, Ph.D. Thesis
[48]  
Osama M., 2005, J. Constr. Eng. Manage, V13, P354
[49]   Analysis of causes and impact of variation order on educational building projects [J].
Oyewobi, Luqman Oyekunle ;
Jimoh, Richard ;
Ganiyu, Bashir Olanrewaju ;
Shittu, Abdullateef Adewale .
JOURNAL OF FACILITIES MANAGEMENT, 2016, 14 (02) :139-164
[50]  
Perkins R.A., 2009, Portland Int. Cent. Publ, V59, P2148