共 59 条
- [1] Alaryan A., 2014, International Journal of Engineering Research and Applications, V1, P1, DOI DOI 10.5296/IJAFR.V4I1.5405
- [2] Alnaas K.A.A., 2014, HBRC Journal, V10, P308, DOI DOI 10.1016/J.HBRCJ.2014.01.005
- [4] Alsuliman J. A., 2014, Effective Stakeholder Engagement in Variation Order Management at the Design Stage of Public Sector Construction Projects in Saudi Arabia
- [5] Ammar Y., 2016, Management of Change in Construction ProjectsStudy of Its Causes and Analysis of Its Effects on Claims and Disputes
- [6] [Anonymous], 2017, Accountant Department Report
- [7] [Anonymous], 2021, Construction Extension to the Pmbok Guide
- [8] [Anonymous], 2017, Final Reports, Change Orders, Invoices, (APTECALKIFAHALARABALKHODARYSOUTH STAR) Contractor Head Quarter
- [9] [Anonymous], 2017, AIA Document A2012017 General Conditions of the Contract for Construction
- [10] [Anonymous], 2017, Quarter Report, Quality Control Department