Reconsidering adaptive industrialized construction in Chinese rural areas: responding to the challenge of COVID-19

被引:1
作者
Xiang, Yiming [1 ]
Bu, Jiachen [2 ]
Zhu, Ke [3 ]
Ma, Kehan [1 ]
Opoku, Alex [5 ]
Florez-Perez, Laura [1 ]
Zhang, Hong [3 ]
Wu, Yanhua [4 ]
机构
[1] UCL, Bartlett Sch Sustainable Construct, London, England
[2] Univ Bath, Dept Architecture & Civil Engn, Bath, Avon, England
[3] Southeast Univ, Sch Architecture, Nanjing, Peoples R China
[4] Southeast Univ, Architects & Engineers Co Ltd, Nanjing, Peoples R China
[5] Univ Sharjah, Coll Engn, Architectural Dept, Sharjah, U Arab Emirates
基金
中国国家自然科学基金;
关键词
COVID-19; rural construction; adaptive industrialized construction; construction simulation; SUSTAINABLE CONSTRUCTION; SIMULATION; COMPONENTS; MODEL;
D O I
10.1080/09613218.2022.2081119
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The spread of COVID-19 has caused an increasing demand for public medical rooms, especially in Chinese rural regions. Industrialized building techniques have been shown as capable of fulfilling this demand through the case of the Leishenshan Hospital. However, industrialized construction requires developed technologies and infrastructures, which are often non-existent in rural areas, thus making it difficult to replicate such a feat. Therefore, more suitable solutions for Chinese rural project delivery in the pandemic scenario are needed. Considering the constraints of pandemic prevention and rural applicability, the adaptive industrialized construction (AIC) method has potential as an alternative. This study evaluates the application of AIC by comparing simulated results using AIC and a conventional method, based on five evaluation indicators: construction speed, labourer distribution, material consumption, equipment utilization, and cost. Taking an actual project as the sample building, the results indicate that the AIC method has several advantages. These include a shorter construction period, less labourer gathering onsite, and a lower cost, suggesting it may be an effective solution for rural project delivery during the pandemic. Architects and contractors could employ the same evaluation method to explore more solutions and optimize the construction schedule for future rapid construction needs in rural areas in a pandemic.
引用
收藏
页码:316 / 332
页数:17
相关论文
共 61 条
  • [11] Center for Disease Control, 2021, PROT YOURS OTH
  • [12] Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
    Chen, Ling-Kun
    Yuan, Rui-Peng
    Ji, Xing-Jun
    Lu, Xing-Yu
    Xiao, Jiang
    Tao, Jun-Bo
    Kang, Xin
    Li, Xin
    He, Zhen-Hua
    Quan, Shu
    Jiang, Li-Zhong
    [J]. AUTOMATION IN CONSTRUCTION, 2021, 124
  • [13] Physiological and subjective responses to breathing resistance of N95 filtering facepiece respirators in still-sitting and walking
    Chen, Yumiao
    Yang, Zhongliang
    Wang, Jianping
    Gong, Hugh
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ERGONOMICS, 2016, 53 : 93 - 101
  • [14] Chinese CDC, 2020, CHIN GUID PUBL PROT
  • [15] Chinese National Bureau of Statistics, 2016, MON INV REP MIGR WOR
  • [16] Chinese National Bureau of Statistics, 2021, MON INV REP MIGR WOR
  • [17] Crain D., 2020, ANOTHER COVID SIDE E, V43, P1
  • [18] Currie J., 2020, EVEN COVID CANT STOP, V37, P27
  • [19] Offsite Construction for Emergencies: A focus on Isolation Space Creation (ISC) measures for the COVID-19 pandemic
    Gbadamosi, Abdul-Quayyum
    Oyedele, Lukumon
    Olawale, Oladimeji
    Abioye, Sofiat
    [J]. PROGRESS IN DISASTER SCIENCE, 2020, 8
  • [20] Promotion and Abandonment on the Traditional Local Residence in Northern Jiangsu during the New Rural Construction
    Gong, Xiaofang
    Li, Yuan
    [J]. SUSTAINABLE DEVELOPMENT OF URBAN INFRASTRUCTURE, PTS 1-3, 2013, 253-255 : 17 - +