Fuzzy cognitive-based goal programming for waste rock management with in-pit dumping priority: Towards sustainable mining

被引:13
作者
Bakhtavar, Ezzeddin [1 ,2 ,4 ]
Saberi, Sahra [1 ]
Hu, Guangji [3 ]
Sadiq, Rehan [2 ]
Hewage, Kasun [2 ]
机构
[1] Urmia Univ Technol, Fac Environm, Orumiyeh, Iran
[2] Univ British Columbia, Sch Engn, Okanagan Campus, Kelowna, BC, Canada
[3] Qingdao Univ, Sch Environm Sci & Engn, 308 Ningxia Rd, Qingdao 266071, Shandong, Peoples R China
[4] Univ British Columbia, Sch Engn, Okanagan 3333 Univ Way, Kelowna, BC V1V 1V7, Canada
关键词
Sustainable mining; Internal (in -pit) dumping; Mine waste scheduling; Fuzzy cognitive map; Goal programming;
D O I
10.1016/j.resourpol.2023.104095
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Internal (in-pit) dumping is a sustainable waste rock management approach that can mitigate the potential adverse environmental, social, and economic impacts of conventional off-site dumping. In this study, a fuzzy-weighted multi-objective programming model was developed to determine the best feasible waste scheduling strategy. Minimizing waste rock hauling cost, social complaints, environmental penalties, and operational issues are the main objectives of the model. A fuzzy cognitive map was incorporated into the model to analyze the objectives based on their causal relationships. Various weighting scenarios were used to assess the influence of prioritization of objectives on the waste scheduling results. The model was applied to a surface mine containing several lens-shaped limestone deposits. It was found that entirely dumping waste rock in the internal dumps (D1 -D3) could lead to the lowest social, environmental, and operational issues under the causal weights of 0.272, 0.267, 0.230, and 0.230 for the social, environmental, economic, and operational objectives, respectively. However, the distances between the extraction sites and internal dumps are large compared to external dumps (K1 and K2), and dumping in the external dumps resulted in significantly more social complaints and environmental effects. A sensitivity analysis on the capacity of the preferred internal dump (D1) indicated that if its capacity is inadequate to accommodate all wastes, the less preferable internal dumps would be used, followed by external dumps.
引用
收藏
页数:12
相关论文
共 31 条
[1]   Evaluating the impacts of the transition from open-pit to underground mining on sustainable development indexes [J].
Badakhshan, Naser ;
Shahriar, Kourosh ;
Afraei, Sajjad ;
Bakhtavar, Ezzeddin .
JOURNAL OF SUSTAINABLE MINING, 2023, 22 (02) :155-168
[2]   Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management [J].
Badiozamani, M. M. ;
Ben-Awuah, E. ;
Askari-Nasab, H. .
JOURNAL OF ENVIRONMENTAL INFORMATICS, 2019, 33 (02) :96-104
[3]   Assessment of arsenic concentration along a surface water flow path from Zarshuran gold mine to the downstream residential area [J].
Bakhshinezhad, Hadi ;
Bakhtavar, Ezzeddin ;
Afghan, Arash .
ENVIRONMENTAL EARTH SCIENCES, 2019, 78 (24)
[4]   Planning of cement plants for environmentally friendly production: a fuzzy-weighted stochastic multi-objective model [J].
Bakhtavar, E. ;
Lotfian, R. ;
Sadiq, R. ;
Hewage, K. .
CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2019, 21 (10) :2005-2014
[5]  
Bakhtavar E, 2017, J MIN ENVIRON, V8, P475, DOI 10.22044/jme.2017.934
[6]   Oil sands mine planning and waste management using mixed integer goal programming [J].
Ben-Awuah, Eugene ;
Askari-Nasab, Hooman .
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2011, 25 (03) :226-247
[7]  
Charnes A.Cooper W., 1961, Management models and industrial applications of linear programming
[8]   Improved optimised scheduling in stratified deposits in open pit mines - using in-pit dumping [J].
Das, Ranajit ;
Topal, Erkan ;
Mardaneh, Elham .
INTERNATIONAL JOURNAL OF MINING RECLAMATION AND ENVIRONMENT, 2022, 36 (04) :287-304
[9]   Mathematical modelling of waste rock management through incorporating open-pit waste rocks in underground stope filling: An environmental approach [J].
Esmailzadeh, Saghar ;
Bakhtavar, Ezzeddin ;
Mokhtarian-Asl, Mojtaba ;
Sadiq, Rehan ;
Hewage, Kasun .
RESOURCES POLICY, 2023, 85
[10]   A new model for open-pit production and waste-dump scheduling [J].
Fu, Zhao ;
Asad, Mohammad Waqar Ali ;
Topal, Erkan .
ENGINEERING OPTIMIZATION, 2019, 51 (04) :718-732