Optimization of Stochastic Repetitive Construction Projects: Minimizing Duration Uncertainties

被引:0
作者
Abosamra, Hussein [1 ]
ElSayad, Mohamed A. [1 ]
Eid, Mohamed S. [1 ]
Elhakeem, Ahmed [1 ]
机构
[1] Arab Acad Sci Technol & Maritime Transport, Dept Construct & Bldg Engn, Cairo, Egypt
来源
COMPUTING IN CIVIL ENGINEERING 2023-VISUALIZATION, INFORMATION MODELING, AND SIMULATION | 2024年
关键词
MODEL; LOB;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Various studies aimed to optimize the schedules of repetitive projects using line of balance (LOB) via different meta-heuristic optimization techniques. However, most studies considered constant productivity rates to complete activities' units, disregarding the stochastic nature of the construction methods. This paper aims to minimize the uncertainties of the total project duration in non-serial repetitive projects using non-dominated sorting genetic algorithm II optimization (NSGA II). This is achieved through (1) developing a generic scheduling module for repetitive projects using best practices for LOB, (2) utilizing Monte Carlo simulation to assess the effect of uncertainties of crews' productivity rates on the total project duration, and (3) implementing NSGA II to optimize the total project duration and minimize the overall standard deviation of the stochastic project schedule. The presented model would thus help planners and decision-makers to define the optimal schedules that decrease the uncertainties in meeting the scheduled project due date, thus decreasing the overall project risk.
引用
收藏
页码:180 / 188
页数:9
相关论文
共 50 条
[41]   Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities [J].
Zheng, Wei-bo ;
He, Yu-kang .
PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, :239-243
[42]   Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method [J].
Cao, Ping ;
Li, Danyang ;
Cao, Zhi ;
Huang, Dinglei ;
Wang, Jiawei .
BUILDINGS, 2025, 15 (08)
[43]   Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization [J].
Togan, Vedat ;
Eirgash, M. Azim .
KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) :10-20
[44]   Development Strategy Optimization for Off-Site Construction Projects: Synergy of the Government and Developers [J].
Dou, Yudan ;
Xue, Xiaolong ;
Li, Hong Xian ;
Luo, Xiaowei ;
Li, Zhongfu .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (03)
[45]   Hierarchical Supplier Selection Optimization with Multiple Items in Large-Scale Construction Projects [J].
Tu, Yan ;
Zhou, Xiaoyang ;
Gang, Jun ;
Xu, Jiuping ;
Shen, Wenjing ;
Lev, Benjamin .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2017, 23 (03)
[46]   Stochastic optimization considering the uncertainties in the electricity demand, natural gas infrastructures, photovoltaic units, and wind generation [J].
Alvarez, Gonzalo E. .
COMPUTERS & CHEMICAL ENGINEERING, 2022, 160
[47]   Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties [J].
Sha, Yue ;
Zhang, Junlong ;
Cao, Hui .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 290 (03) :886-900
[48]   A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects [J].
Nguyen, Dang-Trinh ;
Doan, Dinh-Thien-Vuong ;
Tran, Nguyen-Ngoc Cuong ;
Tran, Duc-Hoc .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (05) :843-854
[49]   Mountain railway alignment optimization integrating layouts of large-scale auxiliary construction projects [J].
Song, Taoran ;
Pu, Hao ;
Schonfeld, Paul ;
Liang, Zhu ;
Zhang, Ming ;
Hu, Jianping ;
Zhou, Yuhui ;
Xu, Zhanjun .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2023, 38 (04) :433-453
[50]   An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects [J].
Takleef, Firas ;
Ayadi, Omar ;
Masmoudi, Faouzi .
APPLIED SCIENCES-BASEL, 2025, 15 (08)