共 50 条
[41]
Resource Constrained Project Scheduling Optimization With Robust Objective Under Stochastic Duration Of Activities
[J].
PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING,
2017,
:239-243
[50]
An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects
[J].
APPLIED SCIENCES-BASEL,
2025, 15 (08)