Techno-economic assessment of retrofitting indirect-heated calcium looping using coal and biomass as fuels into an existing cement plant for CO2 capture

被引:8
作者
Yin, Junjun [1 ,4 ]
Li, Chao'en [1 ,2 ]
Paicu, Gabriel [3 ]
Su, Shi [1 ]
机构
[1] CSIRO Mineral Resources, Kenmore, Qld 4069, Australia
[2] CSIRO Energy, 71 Normanby Rd, Clayton North, Vic 3169, Australia
[3] Boral Cement, Maldon, NSW 2577, Australia
[4] Dept Environm & Sci, 400 George St, Brisbane, Qld 4000, Australia
来源
GAS SCIENCE AND ENGINEERING | 2024年 / 123卷
关键词
Cement production; CO2; capture; Indirect-heating; Calcium looping; Solid waste-derived fuel; Energy integration; CARBON CAPTURE; CALCINATION; CA; DESIGN; INDUSTRY; GAS;
D O I
10.1016/j.jgsce.2024.205236
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The indirect -heated calcium carbonate looping (IH-CCL) process is an advanced carbon capture technology. It eliminates the need of an energy -intensive air separation unit that is required in the conventional oxy-fired calcium carbonate looping process, thereby potentially leading to lower energy consumption and cost. The IHCCL process has not been well studied for application in the existing cement industry with minimized modification to the current plant. This paper presents a techno-economic feasibility assessment of retrofitting IH-CCL into an existing cement plant to better understand the CO2 emission reduction, energy performance, and economic costs. Solid waste -derived fuel (SWDF) containing 90-95% of wood is burnt for pre -calcination. Thermal coal is applied in the rotary kiln at which clinker is formed at a higher temperature. A model for process simulation using Aspen Plus and techno-economic analysis was established to supply options to the current cement plant based on different targets in CO2 capture (>80%) and the capital cost. Three integration scenarios, including the downstream integration, tail -end integration, and the full integration, were analyzed. A sensitivity analysis of the cost of CO2 avoided (CCA) was also performed, which revealed that the IH-CCL tail -end integration is recommended for retrofitting to existing cement plants due to the lowest CCA and very minor impact on the existing cement manufacture process. It was also concluded that although the full integration scenario offers the lowest specific primary energy consumption for CO2 avoided (SPECCA) and clinker cost, it may better suit greenfield cement plants as this option requires significant modifications.
引用
收藏
页数:15
相关论文
共 59 条
[1]   New CO2 Capture Process for Hydrogen Production Combining Ca and Cu Chemical Loops [J].
Abanades, J. C. ;
Murillo, R. ;
Fernandez, J. R. ;
Grasa, G. ;
Martinez, I. .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2010, 44 (17) :6901-6904
[2]   Fluidized bed combustion systems integrating CO2 capture with CaO [J].
Abanades, JC ;
Anthony, EJ ;
Wang, JS ;
Oakey, JE .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2005, 39 (08) :2861-2866
[3]  
[Anonymous], 2010, World energy outlook 2010, P1
[4]   Cost and Emissions Reduction in CO2 Capture Plant Dependent on Heat Exchanger Type and Different Process Configurations: Optimum Temperature Approach Analysis [J].
Aromada, Solomon Aforkoghene ;
Eldrup, Nils Henrik ;
oi, Lars Erik .
ENERGIES, 2022, 15 (02)
[5]   Gas conditioning -: The interface between CO2 capture and transport [J].
Aspelund, Audun ;
Jordal, Kristin .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2007, 1 (03) :343-354
[6]   Separation of carbon dioxide from flue emissions using Endex principles [J].
Ball, R. ;
Sceats, M. G. .
FUEL, 2010, 89 (10) :2750-2759
[7]   CO2 Capture in the Cement Industry [J].
Barker, D. J. ;
Turner, S. A. ;
Napier-Moore, P. A. ;
Clark, M. ;
Davison, J. E. .
GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01) :87-94
[8]  
Beyond Zero Emissions, 2017, Research: Rethinking Cement | Clean Technology
[9]   CO2 Capture in the Cement Industry, Norcem CO2 Capture Project (Norway) [J].
Bjerge, Liv-Margrethe ;
Brevik, Per .
12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 :6455-6463
[10]  
Boral, 2017, Boral Berrima Cement, P1