A Weighted Fuzzy Social Network Analysis-Based Approach for Modeling and Analyzing Relationships Among Risk Factors Affecting Project Delays

被引:11
作者
Bashir, Hamdi [1 ,11 ]
Hamdan, Sadeque [2 ,3 ]
Ojiako, Udechukwu [4 ,5 ,6 ]
Haridy, Salah [7 ,8 ]
Shamsuzzaman, Mohammad [9 ]
Al Zarooni, Hassan Ahmed [10 ]
机构
[1] Univ Sharjah, Ind Engn & Engn Management, Sharjah, U Arab Emirates
[2] Univ Kent, Operat Management, Canterbury, England
[3] Univ Paris Saclay, Gif Sur Yvette, France
[4] Univ Sharjah, Engn Management, Sharjah, U Arab Emirates
[5] Univ Hull, Kingston Upon Hull, England
[6] Nnamdi Azikiwe Univ, Awka, Nigeria
[7] Univ Sharjah, Dept Ind Engn & Engn Management, Sharjah, U Arab Emirates
[8] Benha Univ, Banha, Egypt
[9] Univ Sharjah, Dept Ind Engn & Engn Management, Sharjah, U Arab Emirates
[10] Univ Sharjah, Sharjah, U Arab Emirates
[11] Univ Sharjah, Coll Engn, Sustainable Engn Asset Management SEAM Res Grp, Sharjah, U Arab Emirates
关键词
modeling; network; project delays; risk factors; Decision making & risk management; program & project management; GROUP DECISION-MAKING; CONSTRUCTION PROJECTS; COMPUTER-GRAPHICS; SYSTEM DYNAMICS; COMPLEX; SCHEDULE; SUPPORT;
D O I
10.1080/10429247.2022.2162305
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the last decade, it has been increasingly recognized that efforts to address project delays without understanding the relationships among risk factors (RFs) could be futile. In light of the limitations of previous research that has addressed this issue, this study seeks to contribute to the literature by developing a novel weighted fuzzy social network analysis (SNA)-based approach, which accounts for the likelihood of occurrence and the impact of RFs on one another. To validate its practicality, the approach is applied to a demonstrative study in which the causes of delays in real-world electrical installation projects were modeled and analyzed. In addition to providing a holistic view of relationships among RFs, the proposed approach enables engineering managers to identify the root causes of delays and their corresponding critical propagation paths. Compared to other approaches in the literature, the value of the approach lies in its simplicity and utility for supporting engineering managers in developing effective risk-mitigation plans to minimize the severity of project delays.
引用
收藏
页码:3 / 13
页数:11
相关论文
共 60 条
[41]   Causes of Delay in Power Transmission Projects: An Empirical Study [J].
Pall, Goutom K. ;
Bridge, Adrian J. ;
Gray, Jason ;
Skitmore, Martin .
ENERGIES, 2020, 13 (01)
[42]   WHY TRIANGULAR MEMBERSHIP FUNCTIONS [J].
PEDRYCZ, W .
FUZZY SETS AND SYSTEMS, 1994, 64 (01) :21-30
[43]   Integrated Risk of Progress-Based Costs and Schedule Delays in Construction Projects [J].
Pehlivan, Salahi ;
Oztemir, Ali Erhan .
ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (02) :108-116
[44]   Self-Organizing Networks in Complex Infrastructure Projects [J].
Pryke, Stephen ;
Badi, Sulafa ;
Almadhoob, Huda ;
Soundararaj, Balamurugan ;
Addyman, Simon .
PROJECT MANAGEMENT JOURNAL, 2018, 49 (02) :18-41
[45]  
Qazi Abroon, 2020, Engineering Management Journal, V32, P86, DOI [10.1080/10429247.2019.1664249, 10.1080/10429247.2019.1664249]
[46]   From Risk Matrices to Risk Networks in Construction Projects [J].
Qazi, Abroon ;
Dikmen, Irem .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2021, 68 (05) :1449-1460
[47]   Causes and effects of delays in Malaysian construction industry [J].
Sambasivan, Murali ;
Soon, Yau Wen .
International Journal of Project Management, 2007, 25 (05) :517-526
[48]   Causes of delay in the global construction industry: a meta analytical review [J].
Sanni-Anibire, Muizz O. ;
Zin, Rosli Mohamad ;
Olatunji, Sunday Olusanya .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (08) :1395-1407
[49]  
Saunders R. G., 1992, International Journal of Project Management, V10, P153, DOI 10.1016/0263-7863(92)90004-S
[50]   Effects of Project-Related and Organizational-Related Factors on Five Dimensions of Project Performance: A Study Across the Construction Sectors in Malaysia [J].
Sekar, Gopal ;
Viswanathan, Kuperan ;
Sambasivan, Murali .
ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (04) :247-261