A Weighted Fuzzy Social Network Analysis-Based Approach for Modeling and Analyzing Relationships Among Risk Factors Affecting Project Delays

被引:11
作者
Bashir, Hamdi [1 ,11 ]
Hamdan, Sadeque [2 ,3 ]
Ojiako, Udechukwu [4 ,5 ,6 ]
Haridy, Salah [7 ,8 ]
Shamsuzzaman, Mohammad [9 ]
Al Zarooni, Hassan Ahmed [10 ]
机构
[1] Univ Sharjah, Ind Engn & Engn Management, Sharjah, U Arab Emirates
[2] Univ Kent, Operat Management, Canterbury, England
[3] Univ Paris Saclay, Gif Sur Yvette, France
[4] Univ Sharjah, Engn Management, Sharjah, U Arab Emirates
[5] Univ Hull, Kingston Upon Hull, England
[6] Nnamdi Azikiwe Univ, Awka, Nigeria
[7] Univ Sharjah, Dept Ind Engn & Engn Management, Sharjah, U Arab Emirates
[8] Benha Univ, Banha, Egypt
[9] Univ Sharjah, Dept Ind Engn & Engn Management, Sharjah, U Arab Emirates
[10] Univ Sharjah, Sharjah, U Arab Emirates
[11] Univ Sharjah, Coll Engn, Sustainable Engn Asset Management SEAM Res Grp, Sharjah, U Arab Emirates
关键词
modeling; network; project delays; risk factors; Decision making & risk management; program & project management; GROUP DECISION-MAKING; CONSTRUCTION PROJECTS; COMPUTER-GRAPHICS; SYSTEM DYNAMICS; COMPLEX; SCHEDULE; SUPPORT;
D O I
10.1080/10429247.2022.2162305
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the last decade, it has been increasingly recognized that efforts to address project delays without understanding the relationships among risk factors (RFs) could be futile. In light of the limitations of previous research that has addressed this issue, this study seeks to contribute to the literature by developing a novel weighted fuzzy social network analysis (SNA)-based approach, which accounts for the likelihood of occurrence and the impact of RFs on one another. To validate its practicality, the approach is applied to a demonstrative study in which the causes of delays in real-world electrical installation projects were modeled and analyzed. In addition to providing a holistic view of relationships among RFs, the proposed approach enables engineering managers to identify the root causes of delays and their corresponding critical propagation paths. Compared to other approaches in the literature, the value of the approach lies in its simplicity and utility for supporting engineering managers in developing effective risk-mitigation plans to minimize the severity of project delays.
引用
收藏
页码:3 / 13
页数:11
相关论文
共 60 条
[1]   Modeling and analyzing project interdependencies in project portfolios using an integrated social network analysis-fuzzy TOPSIS MICMAC approach [J].
Al Zaabi, Helal ;
Bashir, Hamdi .
INTERNATIONAL JOURNAL OF SYSTEM ASSURANCE ENGINEERING AND MANAGEMENT, 2020, 11 (06) :1083-1106
[2]  
Al Zaabi H, 2018, 2018 5TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), P490, DOI 10.1109/IEA.2018.8387150
[3]   Modeling and analyzing critical success factors for implementing environmentally sustainable practices in a public utilities organization: a case study [J].
Albastaki, Fouzeya M. ;
Bashir, Hamdi ;
Ojiako, Udechukwu ;
Shamsuzzaman, Mohammad ;
Haridy, Salah .
MANAGEMENT OF ENVIRONMENTAL QUALITY, 2021, 32 (04) :768-786
[4]  
Alnemer O., 2020, P 5 INT C IND ENG OP, P2896
[5]  
Alzebdeh K, 2015, The Journal of Engineering Research [TJER], V12, P53, DOI [10.24200/tjer.vol12iss1pp53-68, 10.24200/tjer.vol12iss1pp53-68, DOI 10.24200/TJER.VOL12ISS1PP53-68]
[6]   Interpretive Structural Model-based for Analysis of Causes of Delays in Construction Projects: The Portuguese Case [J].
Arantes, Amilcar ;
Ferreira, Luis Miguel D. F. .
PROCEEDINGS OF THE 10TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS (ICORES), 2021, :366-374
[7]   The analysis of information flow interdependencies within projects [J].
Bashir, Hamdi ;
Ojiako, Udechukwu ;
Marshall, Alasdair ;
Chipulu, Maxwell ;
Yousif, Amer A. .
PRODUCTION PLANNING & CONTROL, 2022, 33 (01) :20-36
[8]   Modeling and Analyzing Factors Affecting Project Delays Using an Integrated Social Network-Fuzzy MICMAC Approach [J].
Bashir, Hamdi ;
Ojiako, Udechukwu ;
Mota, Caroline .
ENGINEERING MANAGEMENT JOURNAL, 2020, 32 (01) :26-36
[9]   System Dynamics Understanding in Projects: Information Sharing, Psychological Safety, and Performance Effects [J].
Bendoly, Elliot .
PRODUCTION AND OPERATIONS MANAGEMENT, 2014, 23 (08) :1352-1369
[10]   Oversight and Efficiency in Public Projects: A Regression Discontinuity Analysis [J].
Calvo, Eduard ;
Cui, Ruomeng ;
Serpa, Juan Camilo .
MANAGEMENT SCIENCE, 2019, 65 (12) :5651-5675