Mathematical model and augmented simulated annealing algorithm for mixed-model assembly job shop scheduling problem with batch transfer

被引:8
作者
Cheng, Lixin [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
Liu, Shengli [1 ]
Zhang, Liping [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Minist Educ, Key Lab Met Equipment & Control Technol, Wuhan, Hubei, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Hubei, Peoples R China
关键词
Mixed-model assembly job-shop; scheduling; Batch transfer; Gene expression programming; Clustering; Simulated annealing; DISPATCHING RULES; GENETIC ALGORITHM; OPTIMIZATION; PERFORMANCE;
D O I
10.1016/j.knosys.2023.110968
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In the mixed-model assembly job-shops, all the components are transferred in batches from the processing stage to the assembly stage to reduce transportation costs and timely satisfy the assembly material requirements. However, batch transfer in such a workshop has not received due attention in the current literature. Thus, this work addresses the mixed-model assembly job-shop scheduling problem with batch transfer via a mathematical model and an augmented simulated annealing algorithm to minimize manufacturing and transportation costs. The mathematical model takes batch transfer constraints into account and constructs the temporal and spatial links among the processing, transfer, and assembly stages. Production sequencing knowledge and batch transfer knowledge are first extracted via gene expression programming algorithm and clustering method and then implanted into the algorithmic operators in the form of rules and strategies to directly identify the promising solution space. Besides, eleven neighborhood structures including the critical component-based and batch based ones, are designed to enhance the exploitation ability. A restart mechanism considering crossover and tempering helps to get out of local optima. Experimental results indicate that by adopting the extracted knowledge, problem-specific neighborhood structures, and restart mechanism, the proposed algorithm significantly outperforms other comparison algorithms in fixing the studied problem.(c) 2023 Published by Elsevier B.V.
引用
收藏
页数:17
相关论文
共 48 条
[11]   A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process [J].
Fattahi, Parviz ;
Rad, Naeeme Bagheri ;
Daneshamooz, Fatemeh ;
Ahmadi, Samad .
ASSEMBLY AUTOMATION, 2020, 40 (03) :419-432
[12]   Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation [J].
Fernandez-Viagas, Victor ;
Talens, Carla ;
Framinan, Jose M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 299 (03) :869-882
[13]   Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures [J].
Framinan, Jose M. ;
Perez-Gonzalez, Paz ;
Fernandez-Viagas, Victor .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 273 (02) :401-417
[14]   Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times [J].
Hatami, Sara ;
Ebrahimnejad, Sadalah ;
Tavakkoli-Moghaddam, Reza ;
Maboudian, Yasaman .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12) :1153-1164
[15]   A multiobjective evolutionary algorithm for achieving energy efficiency in production environments integrated with multiple automated guided vehicles [J].
He, Lijun ;
Chiong, Raymond ;
Li, Wenfeng ;
Budhi, Gregorius Satia ;
Zhang, Yu .
KNOWLEDGE-BASED SYSTEMS, 2022, 243
[16]   The two stage assembly flow-shop scheduling problem with batching and delivery [J].
Kazemi, Hamed ;
Mazdeh, Mohammad Mahdavi ;
Rostami, Mohammad .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2017, 63 :98-107
[17]   Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem [J].
Komaki, G. M. ;
Teymourian, Ehsan ;
Kayvanfar, Vahid ;
Booyavi, Zahra .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 105 :158-173
[18]   The three-stage assembly flowshop scheduling problem [J].
Koulamas, C ;
Kyparisis, GJ .
COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) :689-704
[19]   Memetic algorithm for solving flexible flow-shop scheduling problems with dynamic transport waiting times [J].
Lei, Chuanjin ;
Zhao, Ning ;
Ye, Song ;
Wu, Xiuli .
COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 139
[20]   Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach [J].
Lu, H. L. ;
Huang, George Q. ;
Yang, H. D. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (03) :647-669