A large neighborhood search-based matheuristic for the load-dependent electric vehicle routing problem with time windows

被引:30
作者
Rastani, Sina [1 ,2 ,3 ]
Catay, Bulent [2 ,3 ]
机构
[1] Yeditepe Univ, Ind & Syst Engn Dept, Istanbul, Turkey
[2] Sabanci Univ, Fac Engn & Nat Sci, Istanbul, Turkey
[3] Sabanci Univ, Smart Mobil & Logist Lab, Istanbul, Turkey
关键词
Electric vehicle routing; Time windows; Load-dependent; Energy consumption; ALGORITHM; TEMPERATURE; DELIVERY;
D O I
10.1007/s10479-021-04320-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Range anxiety of electric vehicles (EVs) still poses a major barrier in their adoption in the logistics operations despite the advancements in the battery technology. The need for recharging the battery during the day brings additional complexities to the operational planning of commercial EVs in last mile deliveries. The driving range of an EV may vary according to different factors including ambient temperature, weight, speed, acceleration/deceleration, and the road profile. In this study, we revisit the well-known electric vehicle routing problem with time windows by taking into account the weight of the load carried. Cargo weight may play a crucial role in the operational efficiency of the EVs since it may affect the energy consumption significantly. We first present two alternative mathematical formulations of the problem and test their performances on small-size instances that can be solved using a commercial solver. Next, we develop a matheuristic approach that integrates an optimal repair procedure in the large neighbourhood search method and validate its performance. Then, we present an extensive numerical study to investigate the influence of load on the routing decisions. Our results show that cargo weight may create substantial changes in the route plans and fleet size, and neglecting it may cause severe disruptions in service and increase the costs.
引用
收藏
页码:761 / 793
页数:33
相关论文
共 60 条
[1]   Sensitivity analysis for energy demand estimation of electric vehicles [J].
Asamer, Johannes ;
Graser, Anita ;
Heilmann, Bernhard ;
Ruthmair, Mario .
TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2016, 46 :182-199
[2]  
Bertsekas D.P., 1999, NONLINEAR PROGRAMMIN
[3]   The electric two-echelon vehicle routing problem [J].
Breunig, U. ;
Baldacci, R. ;
Hartl, R. F. ;
Vidal, T. .
COMPUTERS & OPERATIONS RESEARCH, 2019, 103 :198-210
[4]  
Bruglieri M, 2016, Electronic Notes in Discrete Mathematics, V55, P89, DOI [10.1016/j.endm.2016.10.023, DOI 10.1016/J.ENDM.2016.10.023]
[5]  
Bruglieri M, 2015, Electronic Notes in Discrete Mathematics, V47, P221, DOI [10.1016/j.endm.2014.11.029, 10.1016/j.endm.2014.11.029, DOI 10.1016/J.ENDM.2014.11.029]
[6]   The multi-depot electric vehicle location routing problem with time windows [J].
Camilo Paz, Juan ;
Granada-Echeverri, Mauricio ;
Willmer Escobar, John .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (01) :123-136
[7]  
Çatay B, 2017, IEEE SYMP COMP COMMU, P152, DOI 10.1109/ISCC.2017.8024521
[8]  
Conrad RyanG., 2011, P 2011 IND ENG RES C, P8
[9]   The Chinese Postman Problem with Load-Dependent Costs [J].
Corberan, Angel ;
Erdogan, Gunes ;
Laporte, Gilbert ;
Plana, Isaac ;
Sanchis, Jose M. .
TRANSPORTATION SCIENCE, 2018, 52 (02) :370-385
[10]   An adaptive large neighborhood search heuristic for the Pollution-Routing Problem [J].
Demir, Emrah ;
Bektas, Tolga ;
Laporte, Gilbert .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 223 (02) :346-359