Pareto-optimal front generation for the bi-objective JIT scheduling problems with a piecewise linear trade-off between objectives

被引:3
作者
Babu, Sona [1 ]
Girish, B. S. [1 ]
机构
[1] Indian Inst Space Sci & Technol, Dept Aerosp Engn, Thiruvananthapuram 695547, Kerala, India
关键词
Multi -objective optimization; Single -machine scheduling; Earliness -tardiness objectives; Total flowtime; Pareto front generation; Just -in -time manufacturing; SINGLE-MACHINE; UPPER ENVELOPE; EXACT ALGORITHM; TARDINESS; EARLINESS; MINIMIZE; SEGMENTS; DISTINCT; SEARCH; TIME;
D O I
10.1016/j.orp.2024.100299
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper proposes a novel method of Pareto front generation from a set of piecewise linear trade-off curves typically encountered in bi-objective just -in -time (JIT) scheduling problems. We have considered the simultaneous minimization of total weighted earliness and tardiness (TWET) and total flowtime (TFT) objectives in a single -machine scheduling problem (SMSP) with distinct job due dates allowing inserted idle times in the schedules. An optimal timing algorithm (OTA) is presented to generate the trade-off curve between TWET and TFT for a given sequence of jobs. The proposed method of Pareto front generation generates a Pareto-optimal front constituted of both line segments and points. Further, we employ a simple local search method to generate sequences of jobs and their respective trade-off curves, which are trimmed and merged to generate the Pareto-optimal front using the proposed method. Computational results obtained using problem instances of different sizes reveal the efficiency of the proposed OTA and the Pareto front generation method over the stateof-the-art methodologies adopted from the literature.
引用
收藏
页数:15
相关论文
共 47 条
[21]   Exact algorithms for multiobjective linear optimization problems with integer variables: A state of the art survey [J].
Halffmann, Pascal ;
Schaefer, Luca E. ;
Daechert, Kerstin ;
Klamroth, Kathrin ;
Ruzika, Stefan .
JOURNAL OF MULTI-CRITERIA DECISION ANALYSIS, 2022, 29 (5-6) :341-363
[22]   FINDING THE UPPER ENVELOPE OF N LINE SEGMENTS IN O(N LOG N) TIME [J].
HERSHBERGER, J .
INFORMATION PROCESSING LETTERS, 1989, 33 (04) :169-174
[23]  
IBM, 2021, IBM Documentation
[24]   An exact algorithm for the bi-objective timing problem [J].
Jacquin, Sophie ;
Dufosse, Fanny ;
Jourdan, Laetitia .
OPTIMIZATION LETTERS, 2018, 12 (04) :903-914
[25]  
Jacquin S, 2016, PROCEEDINGS OF 2016 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI)
[26]  
Jozefowska J, 2007, INT SER OPER RES MAN, V106, P1, DOI 10.1007/978-0-387-71718-0
[27]   FINDING MAXIMA OF A SET OF VECTORS [J].
KUNG, HT ;
LUCCIO, F ;
PREPARATA, FP .
JOURNAL OF THE ACM, 1975, 22 (04) :469-476
[28]  
LAWLER EL, 1993, LOGISTICS PRODUCTION, P445, DOI DOI 10.1016/S0927-0507(05)80189-6
[29]   A GENETIC ALGORITHM FOR JOB SEQUENCING PROBLEMS WITH DISTINCT DUE-DATES AND GENERAL EARLY-TARDY PENALTY WEIGHTS [J].
LEE, CY ;
CHOI, JY .
COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (08) :857-869
[30]   Robust scheduling on a single machine to minimize total flow time [J].
Lu, Chung-Cheng ;
Lin, Shih-Wei ;
Ying, Kuo-Ching .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) :1682-1691