Pareto-optimal front generation for the bi-objective JIT scheduling problems with a piecewise linear trade-off between objectives

被引:3
作者
Babu, Sona [1 ]
Girish, B. S. [1 ]
机构
[1] Indian Inst Space Sci & Technol, Dept Aerosp Engn, Thiruvananthapuram 695547, Kerala, India
关键词
Multi -objective optimization; Single -machine scheduling; Earliness -tardiness objectives; Total flowtime; Pareto front generation; Just -in -time manufacturing; SINGLE-MACHINE; UPPER ENVELOPE; EXACT ALGORITHM; TARDINESS; EARLINESS; MINIMIZE; SEGMENTS; DISTINCT; SEARCH; TIME;
D O I
10.1016/j.orp.2024.100299
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper proposes a novel method of Pareto front generation from a set of piecewise linear trade-off curves typically encountered in bi-objective just -in -time (JIT) scheduling problems. We have considered the simultaneous minimization of total weighted earliness and tardiness (TWET) and total flowtime (TFT) objectives in a single -machine scheduling problem (SMSP) with distinct job due dates allowing inserted idle times in the schedules. An optimal timing algorithm (OTA) is presented to generate the trade-off curve between TWET and TFT for a given sequence of jobs. The proposed method of Pareto front generation generates a Pareto-optimal front constituted of both line segments and points. Further, we employ a simple local search method to generate sequences of jobs and their respective trade-off curves, which are trimmed and merged to generate the Pareto-optimal front using the proposed method. Computational results obtained using problem instances of different sizes reveal the efficiency of the proposed OTA and the Pareto front generation method over the stateof-the-art methodologies adopted from the literature.
引用
收藏
页数:15
相关论文
共 47 条
[1]  
Bagchi T.P., 1999, Multiobjective Scheduling by Genetic Algorithms, DOI DOI 10.1007/978-1-4615-5237-6
[2]  
Baker KR., 2019, Principles of Sequencing and Scheduling, VSecond, DOI DOI 10.1002/9781119262602
[3]   Multi-objective multi-factory scheduling [J].
Behnamian, Javad ;
Fatemi Ghomi, Seyyed Mohammad Taghi .
RAIRO-OPERATIONS RESEARCH, 2021, 55 (55) :S1447-S1467
[4]  
Ben-Chaim D., 2012, Ratio and proportion: research and teaching in mathematics teachers' education (Pre- and in-service mathematics teachers of Elementary and Middle school classes), DOI [10.1007/978-94-6091-784-4, DOI 10.1007/978-94-6091-784-4]
[5]   Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costs [J].
Bülbül, K ;
Kaminsky, P ;
Yano, C .
NAVAL RESEARCH LOGISTICS, 2004, 51 (03) :407-445
[6]   Minimizing weighted earliness and tardiness penalties in single-machine scheduling with idle time permitted [J].
Chen, JY ;
Lin, SF .
NAVAL RESEARCH LOGISTICS, 2002, 49 (08) :760-780
[7]   On computing the upper envelope of segments in parallel [J].
Chen, W ;
Wada, K .
1998 INTERNATIONAL CONFERENCE ON PARALLEL PROCESSING - PROCEEDINGS, 1998, :253-260
[8]   Minimizing total flow time in the single-machine scheduling problem with periodic maintenance [J].
Chen, WJ .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (04) :410-415
[9]   A Survey on Modeling and Optimizing Multi-Objective Systems [J].
Cho, Jin-Hee ;
Wang, Yating ;
Chen, Ing-Ray ;
Chan, Kevin S. ;
Swami, Ananthram .
IEEE COMMUNICATIONS SURVEYS AND TUTORIALS, 2017, 19 (03) :1867-1901
[10]   Multi-objective Variable Neighborhood Search Algorithms for a Single Machine Scheduling Problem with Distinct due Windows [J].
Claudio Arroyo, Jose Elias ;
Ottoni, Rafael dos Santos ;
Oliveira, Alcione de Paiva .
ELECTRONIC NOTES IN THEORETICAL COMPUTER SCIENCE, 2011, 281 :5-19