Exploring optimal joint operating rules for large-scale inter-basin water transfer projects with multiple water sources, diversion routes, and water demand areas

被引:7
|
作者
Zhong, Huayu [1 ]
Liao, Tao [2 ]
Fang, Guohua [1 ]
Ren, Kang [3 ]
Zhang, Shiwei [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Peoples R China
[2] Jiangsu Prov Water Conservancy Survey & Design Ins, Yangzhou 225000, Peoples R China
[3] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang 443002, Peoples R China
关键词
Inter-basin water transfer; Jiangsu Province section of the South-to-North; Water Diversion Project; Optimized operation; Simulation-optimization approach; Water resources allocation; CLIMATE-CHANGE; SHORTAGES; MODEL; STRESS; POLICY; RIVER;
D O I
10.1016/j.ejrh.2023.101504
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Study region: The Jiangsu Province section of the South-to-North Water Diversion Project (JSSNWDP) is an essential section of the SNWDP, which includes multiple water sources, diversion routes, and water demand areas. Study focus: Exploring effective operating rules for the JSSNWDP is critical to improving its long-term operational performance. However, deriving the operating rule for the JS-SNWDP remains a pressing challenge due to the complexity of its water allocation, which requires trade-offs between multiple water sources and diversion routes when supplying and transferring water. Here, we design a new form of the joint operating rules for the JS-SNWDP that includes water-supply rules and water-transfer rules, and establish a multiobjective optimization operation model by simulation-optimization approach to identify the optimal joint operating rules that contribute to the improvement of water supply reliability and the reduction of operation cost. New hydrological insights for the region: The proposed joint operating rule shows obvious advantages over the regular operating rule, with an increase in the water supply rate (2.0%) while the strongly reduced pumping water (24.7%). Meanwhile, compared with the regular operating rule, the joint operating rule enables a more rational use of the runoff regulation capacity of the lakes, which obviously reducing the pumping water from the Yangtze River and the surplus water in the two lakes obviously. The findings of this study are applicable to improve the operational performance of the JS-SNWDP, and provide a reference for exploring the joint operating rules for other IBWTPs with similar structures.
引用
收藏
页数:16
相关论文
共 41 条
  • [11] Systematic impact assessment on inter-basin water transfer projects of the Hanjiang River Basin in China
    Zhou, Yanlai
    Guo, Shenglian
    Hong, Xingjun
    Chang, Fi-John
    JOURNAL OF HYDROLOGY, 2017, 553 : 584 - 595
  • [12] Optimizing Inter-basin water transfers from multiple sources among interconnected River basins
    Ma, Yongsheng
    Chang, Jianxia
    Guo, Aijun
    Wu, Lianzhou
    Yang, Jie
    Chen, Lei
    JOURNAL OF HYDROLOGY, 2020, 590
  • [13] Eco-environmental impact of inter-basin water transfer projects: a review
    Wen Zhuang
    Environmental Science and Pollution Research, 2016, 23 : 12867 - 12879
  • [14] Multi-Attribute Decision Making on Inter-Basin Water Transfer Projects
    Zarghami, M.
    Szidarovszky, F.
    Ardakanian, R.
    SCIENTIA IRANICA TRANSACTION E-INDUSTRIAL ENGINEERING, 2009, 16 (01): : 73 - 80
  • [15] Multi-reservoir joint operating rule in inter-basin water transfer-supply project
    AnBang Peng
    Yong Peng
    HuiCheng Zhou
    Chi Zhang
    Science China Technological Sciences, 2015, 58 : 123 - 137
  • [16] Multi-reservoir joint operating rule in inter-basin water transfer-supply project
    PENG AnBang
    PENG Yong
    ZHOU HuiCheng
    ZHANG Chi
    Science China(Technological Sciences), 2015, (01) : 123 - 137
  • [17] Optimization Operation Model Coupled with Improving Water-Transfer Rules and Hedging Rules for Inter-Basin Water Transfer-Supply Systems
    Peng, Yong
    Chu, Jinggang
    Peng, Anbang
    Zhou, Huicheng
    WATER RESOURCES MANAGEMENT, 2015, 29 (10) : 3787 - 3806
  • [18] Optimal operation of inter basin water transfer under the form of water sources interconnection with connected tunnel
    Ye, Xiangmin
    Wang, Yimin
    Guo, Aijun
    Wang, Xuebin
    Zhao, Mingzhe
    He, Bing
    Li, Zhehao
    Niu, Chen
    Wang, Quanwei
    JOURNAL OF HYDROLOGY-REGIONAL STUDIES, 2023, 45
  • [19] Optimization Operation Model Coupled with Improving Water-Transfer Rules and Hedging Rules for Inter-Basin Water Transfer-Supply Systems
    Yong Peng
    Jinggang Chu
    Anbang Peng
    Huicheng Zhou
    Water Resources Management, 2015, 29 : 3787 - 3806
  • [20] Analysis of Asynchronism-Synchronism of Regional Precipitation in Inter-Basin Water Transfer Areas
    张强
    王本德
    李慧赟
    TransactionsofTianjinUniversity, 2012, 18 (05) : 384 - 392