Disjunctive optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems

被引:11
作者
Cho, Seolhee [1 ]
Tovar-Facio, Javier [1 ,2 ]
Grossmann, Ignacio E. [1 ]
机构
[1] Carnegie Mellon Univ, Dept Chem Engn, Pittsburgh, PA 15213 USA
[2] Univ Autonoma Chihuahua, Fac Ciencias Quim, Chihuahua 31155, Chih, Mexico
关键词
Power systems; Optimization; Expansion planning; Reliability; PROGRAMMING MODELS; OPTIMAL-DESIGN; MILP MODEL;
D O I
10.1016/j.compchemeng.2023.108243
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper proposes a new optimization model and algorithm for long-term capacity expansion planning of reliable power generation systems. The model optimizes both investment decisions (e.g., size, location, and time to install, retire and decommission facilities) and hourly operation decisions (e.g., on/off status, operating capacity, and expected power output). It is also able to optimize both the main generation capacity and reserve capacity to improve power system reliability. The impact of operational strategies of generators (i.e., participating in electricity production vs. remaining as idle units during operation) on power system reliability is considered. Probability of equipment failures and capacity failure states are used to rigorously estimate the power system reliability depending on design and operation strategies. The optimization model is firstly formulated with Generalized Disjunctive Programming (GDP), which is then reformulated as a mixed-integer linear programming (MILP) model using the Hull relaxation. Two reliability-related penalties, such as downtime penalty and unmet demand (or load shedding) penalty, are included in the objective function to maximize reliability while minimizing the total net present cost. Furthermore, a bilevel decomposition with tailored cuts is developed to reduce computational times of the multi-scale optimization model. The effectiveness of the proposed model is shown by comparing it with the expansion planning model without explicitly considering reliability. We also show that the proposed bilevel decomposition is computationally efficient for solving large-scale problems with millions of variables and constraints through 5-years and 10-years planning case studies.
引用
收藏
页数:22
相关论文
共 50 条
[31]   An Integrated Approach to Long-Term Fuel Supply Planning in Combined Heat and Power Systems [J].
Benalcazar, Pablo ;
Kaminski, Jacek ;
Stos, Karol .
ENERGIES, 2022, 15 (22)
[32]   MANGO: A novel optimization model for the long-term, multi-stage planning of decentralized multi-energy systems [J].
Mavromatidis, Georgios ;
Petkov, Ivalin .
APPLIED ENERGY, 2021, 288
[33]   Long-term economic planning of combined cooling heating and power systems considering energy storage and demand response [J].
Liu, Zuming ;
Zhao, Yingru ;
Wang, Xiaonan .
APPLIED ENERGY, 2020, 279
[34]   MILP model for long-term energy mix planning with consideration of power system reserves [J].
Wierzbowski, Michal ;
Lyzwa, Wojciech ;
Musial, Izabela .
APPLIED ENERGY, 2016, 169 :93-111
[35]   The Capacity Assignment Research among Different Kinds of Power Generators for Long-term Energy Resource Planning [J].
Zhang, Yanfu ;
Liu, Lin ;
Lv, Junchang .
2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, :1768-1771
[36]   Economically and environmentally sustainable long-term power system expansion [J].
Selcuklu, Saltuk B. ;
Rodgers, Mark D. ;
Movlyanov, Atabek .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 164
[37]   Measuring the Long-Term Uncertainty Effect Reduction on Transmission Expansion Planning [J].
Miandoab, Payam Dalaliyan ;
Nazarian, Peyman ;
Moradlou, Majid .
INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2024, 9 (06) :1258-1272
[38]   Method for Determining the Optimal Capacity of Energy Storage Systems with a Long-Term Forecast of Power Consumption [J].
Senchilo, Nikita Dmitrievich ;
Ustinov, Denis Anatolievich .
ENERGIES, 2021, 14 (21)
[39]   Long-term assessment of power capacity incentives by modeling generation investment dynamics under irreversibility and uncertainty [J].
Rios-Festner, Daniel ;
Blanco, Gerardo ;
Olsina, Fernando .
ENERGY POLICY, 2020, 137
[40]   Power system capacity expansion planning model considering carbon emissions constraints [J].
Mejia Giraldo, Diego Adolfo ;
Lopez Lezama, Jesus Maria ;
Gallego Pareja, Luis Alfonso .
REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2012, (62) :114-125