Research on Short-Term Load Forecasting of Distribution Stations Based on the Clustering Improvement Fuzzy Time Series Algorithm

被引:2
|
作者
Gu, Jipeng [1 ]
Zhang, Weijie [1 ]
Zhang, Youbing [1 ]
Wang, Binjie [1 ]
Lou, Wei [2 ]
Ye, Mingkang [3 ]
Wang, Linhai [3 ]
Liu, Tao [4 ]
机构
[1] Zhejiang Univ Technol, Coll Informat Engn, Hangzhou 310023, Peoples R China
[2] State Grid Anhui Elect Power Co Ltd, Elect Power Res Inst, Hefei 230601, Peoples R China
[3] Wencheng Cty Power Supply Co, State Grid Zhejiang Elect Power Co Ltd, Wenzhou 325000, Peoples R China
[4] Zhejiang Tusheng Power Transmiss & Transformat Eng, Tusheng Technol Branch, Wenzhou 325000, Peoples R China
来源
CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES | 2023年 / 136卷 / 03期
基金
中国国家自然科学基金;
关键词
Short-term load forecasting; fuzzy time series; K-means clustering; distribution stations; MODEL; ENROLLMENTS; INTERVALS; LENGTH;
D O I
10.32604/cmes.2023.025396
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An improved fuzzy time series algorithm based on clustering is designed in this paper. The algorithm is successfully applied to short-term load forecasting in the distribution stations. Firstly, the K-means clustering method is used to cluster the data, and the midpoint of two adjacent clustering centers is taken as the dividing point of domain division. On this basis, the data is fuzzed to form a fuzzy time series. Secondly, a high-order fuzzy relation with multiple antecedents is established according to the main measurement indexes of power load, which is used to predict the short-term trend change of load in the distribution stations. Matlab/Simulink simulation results show that the load forecasting errors of the typical fuzzy time series on the time scale of one day and one week are [-50, 20] and [-50, 30], while the load forecasting errors of the improved fuzzy time series on the time scale of one day and one week are [-20, 15] and [-20, 25]. It shows that the fuzzy time series algorithm improved by clustering improves the prediction accuracy and can effectively predict the short-term load trend of distribution stations.
引用
收藏
页码:2221 / 2236
页数:16
相关论文
共 50 条
  • [31] A Novel Aggregated Short-Term Load Forecasting Method Based on Clustering
    Yao, Zhirong
    Fang, Honghang
    Cui, Shichang
    Cai, Min
    Ai, Fuzhou
    Li, Jinyang
    Yang, Zhichun
    2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 1008 - 1013
  • [32] Granular Weighted Fuzzy Approach Applied to Short-Term Load Demand Forecasting
    Zuge, Cesar Vinicius
    Coelho, Leandro dos Santos
    TECHNOLOGIES, 2024, 12 (10)
  • [33] A load curve based fuzzy modeling technique for short-term load forecasting
    Papadakis, SE
    Theocharis, JB
    Bakirtzis, AG
    FUZZY SETS AND SYSTEMS, 2003, 135 (02) : 279 - 303
  • [34] Short-term load forecasting method based on secondary decomposition and improved hierarchical clustering
    Zha, Wenting
    Ji, Yongqiang
    Liang, Chen
    RESULTS IN ENGINEERING, 2024, 22
  • [35] Short-Term Load Forecasting: The Similar Shape Functional Time-Series Predictor
    Paparoditis, Efstathios
    Sapatinas, Theofanis
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) : 3818 - 3825
  • [36] Short-term load forecasting by a neuro-fuzzy based approach
    Liang, RH
    Cheng, CC
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2002, 24 (02) : 103 - 111
  • [37] A new fuzzy time series forecasting method based on clustering and weighted average approach
    Iqbal, Shafqat
    Zhang, Chongqi
    Arif, Muhammad
    Hassan, Munawar
    Ahmad, Shakeel
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (05) : 6089 - 6098
  • [38] Hybrid Clustering-Time Series-Bayesian Neural Network Short-Term Load Forecasting Method
    Ghofrani, M.
    Carson, D.
    Ghayekhloo, M.
    2016 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2016,
  • [39] A fuzzy inference model for short-term load forecasting
    Mamlook, Rustum
    Badran, Omar
    Abdulhadi, Emad
    ENERGY POLICY, 2009, 37 (04) : 1239 - 1248
  • [40] Optimal fuzzy inference for short-term load forecasting
    Mori, H
    Kobayashi, H
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (01) : 390 - 396