Vibration Reduction and Explosion Control Investigation for an Ultra-Shallow Buried Tunnel under Crossing Buildings Based on HHT Analysis

被引:2
作者
Xu, Rui [1 ]
Zhang, Jichun [2 ]
Wu, Bian [3 ]
Zhang, Feng-Liang [3 ,4 ]
机构
[1] Tianjin Municipal Engn Design & Res Inst, Tianjin 300392, Peoples R China
[2] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Peoples R China
[3] Harbin Inst Technol, Sch Civil & Environm Engn, Shenzhen 518055, Peoples R China
[4] Harbin Inst Technol, Guangdong Prov Key Lab Intelligent & Resilient St, Shenzhen 518055, Peoples R China
关键词
HHT; ultra-shallow buried tunnel; cutting hole; instantaneous energy; vibration velocity; millisecond delay blasting; wave interference vibration reduction; TECHNOLOGY;
D O I
10.3390/s23177589
中图分类号
O65 [分析化学];
学科分类号
070302 ; 081704 ;
摘要
With the rapid development of underground space utilization, the excavation of new tunnels with ultra-shallow under crossing buildings using the drilling and blasting method is gradually increasing. The blasting vibration will undoubtedly affect the surrounding buildings. Reducing the impact of blasting vibration on ground buildings has become an important technical challenge faced by tunnel blasting technicians. The inlet end of the Xi'an-Chengdu High-Speed Railway Xiannvyan Tunnel passes below a village through an ultra-shallow buried section; as a result, blasting vibration control is a major concern. A design scheme for a 0.6 m footage in tunnel was proposed and verified through field tests. A 0.8 m footage scheme and 1.8 m footage millisecond interference vibration reduction scheme were proposed, respectively. Based on the HHT analysis, by comparing the surface vibration velocities and instantaneous energy obtained from the millisecond delay detonation of cutting holes and the detonation of different charging schemes, we found that the free surface, mass of single dynamite charges, and tunnel burial depth had significant influences on the surface vibration.
引用
收藏
页数:20
相关论文
共 20 条
[1]  
Chen Q, 2005, ROCK SOIL MECH, V26, P964
[2]   Study on Optimization of Delay Method of Wedge Cut Blasting in Tunnel [J].
Gao, Wenle ;
Liu, Zhicheng ;
Wang, Yanping ;
Yan, Zhenwei ;
Zhang, Zehua .
SHOCK AND VIBRATION, 2021, 2021
[3]   Tunnel millisecond-delay controlled blasting based on the delay time calculation method and digital electronic detonators to reduce structure vibration effects [J].
Guan, Xiaoming ;
Guo, Caixia ;
Mou, Ben ;
Shi, Leilei .
PLOS ONE, 2019, 14 (03)
[4]   Effects of Blasting Vibrations on an Arch in the Jiaohuayu Tunnel Described by Energy Response Spectrum Analysis [J].
Hou, Shijun ;
Xie, Feng ;
Tian, Shuaikang ;
Liang, Shufeng .
APPLIED SCIENCES-BASEL, 2022, 12 (22)
[5]   The empirical mode decomposition and the Hilbert spectrum for nonlinear and non-stationary time series analysis [J].
Huang, NE ;
Shen, Z ;
Long, SR ;
Wu, MLC ;
Shih, HH ;
Zheng, QN ;
Yen, NC ;
Tung, CC ;
Liu, HH .
PROCEEDINGS OF THE ROYAL SOCIETY A-MATHEMATICAL PHYSICAL AND ENGINEERING SCIENCES, 1998, 454 (1971) :903-995
[6]   Reduction of tunnel blasting induced ground vibrations using advanced electronic detonators [J].
Iwano, K. ;
Hashiba, K. ;
Nagae, J. ;
Fukui, K. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 105
[7]   Attenuation model of tunnel blast vibration velocity based on the influence of free surface [J].
Jia, Baoxin ;
Zhou, Linli ;
Cui, Jiaojiao ;
Chen, Hao .
SCIENTIFIC REPORTS, 2021, 11 (01)
[8]  
Langefors U., 1963, MODERN TECHNIQUE ROC
[9]   Study on Internal Vibration Law and Vibration Reduction of Xiaoxiku Tunnel Blasting [J].
Li, Sheng-Lin ;
Liang, Shu-Feng ;
Lu, Jia-Wei .
GEOFLUIDS, 2022, 2022
[10]  
[林大能 Lin Danneng], 2006, [中国工程科学, Engineering science], V8, P73