Stochastic Scheduling for Batch Processes With Downstream Queue Time Constraints

被引:0
作者
Chien, Wen-Chi [1 ]
Chou, Ywh-Leh [2 ]
Wu, Cheng-Hung [3 ,4 ]
机构
[1] Taiwan Semicond Mfg Co Ltd, Fab Operat, Hsinchu 30078, Taiwan
[2] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 407102, Taiwan
[3] Natl Taiwan Univ, Inst Ind Engn, Dept Business Adm, Taipei City 106, Taiwan
[4] Natl Taiwan Univ, Dept Mech Engn, Taipei City 106, Taiwan
关键词
Queue time constraint; batch process; admission control; stochastic scheduling; MANUFACTURING SYSTEMS; RECONFIGURABLE RESOURCES; PRODUCTION LINES; OPTIMIZATION; MODEL; INFORMATION; PERFORMANCE; ALLOCATION; CAPACITY; POLICIES;
D O I
10.1109/TSM.2023.3317679
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research studies the problems of stochastic dynamic scheduling in production systems with batch processes and process queue time (PQT) constraints. The production systems consist of upstream batch processing machines and downstream single processing machines. Under the PQT constraint, waiting time in the downstream queue is constrained by an upper limit and violating this constraint causes scraps of jobs. The batch process increases the probability of PQT constraint violation because a batch of work-in-processes (WIPs) will move simultaneously into the downstream queue after the service completion of batch processes and suffer from higher waiting time variance. A batch process admission control (BPAC) model is developed using Markov decision processes to minimize the sum of long-run average waiting and scrap costs. The proposed BPAC model explicitly considers uncertain factors in production systems given that uncertainties are major reasons for PQT constraint violation. These uncertain factors include job arrival, processing time, and machine breakdown/repair. To cope with these uncertain factors, the BPAC control decisions change dynamically with the real-time machine health and WIP distribution. The performance of BPAC is validated using discrete event simulation, and the simulation results confirm the significant performance improvement in a wide range of batch production environments.
引用
收藏
页码:599 / 610
页数:12
相关论文
共 64 条
[1]   Cycle-time improvements for photolithography process in semiconductor manufacturing [J].
Akçali, E ;
Nemoto, K ;
Uzsoy, R .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2001, 14 (01) :48-56
[2]   Influence of capacity- and time-constrained intermediate storage in two-stage food production systems [J].
Akkerman, Renzo ;
van Donk, Dirk Pieter ;
Gaalman, Gerard .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (13) :2955-2973
[3]   Optimisation of water use in batch process industries [J].
Almató, M ;
Espuña, A ;
Puigjaner, L .
COMPUTERS & CHEMICAL ENGINEERING, 1999, 23 (10) :1427-1437
[4]  
Almomani M.H., 2012, International Journal of the Physical Sciences, V7, P413
[5]  
[Anonymous], 2016, P 15 INT C PROJ MAN
[6]   The single-processor scheduling problem with time restrictions: complexity and related problems [J].
Benmansour, Rachid ;
Braun, Oliver ;
Hanafi, Said .
JOURNAL OF SCHEDULING, 2019, 22 (04) :465-471
[7]   Local scheduling problems submitted to global FIFO processing constraints [J].
Bernier, V ;
Frein, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (08) :1483-1503
[8]   The joint transshipment and production control policies for multi-location production/inventory systems [J].
Bhatnagar, Rohit ;
Lin, Bing .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 275 (03) :957-970
[9]  
Boucherie R. J., 2017, Markov Decision Processes in Practice
[10]   On-line batch process monitoring using dynamic PCA and dynamic PLS models [J].
Chen, JH ;
Liu, KC .
CHEMICAL ENGINEERING SCIENCE, 2002, 57 (01) :63-75