Modified BIM Processes Considering Safety-Quality Index for Precast Concrete Construction

被引:5
作者
Araghi, Zahra Ashtiani [1 ]
Vosoughifar, Hamidreza [2 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, South Tehran Branch, Construct Management, Tehran 1584715414, Iran
[2] Univ Hawaii Manoa, Dept Civil & Environm Engn, 2640 Dole St, Honolulu, HI 96822 USA
关键词
Precast concrete; Building information modelling (BIM); Dimensionless safety-quality index; Genetic expression programming (GEP); Modified fuzzy-DEMATEL (MFD); PREFABRICATION; PRODUCTIVITY; BUILDINGS; DESIGN;
D O I
10.1061/AJRUA6.0001274
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Precast concrete construction (PCC) is one of the most innovative and efficient methods in construction, but the separate processes involved in this method are one of its disadvantages. Therefore, the project owners considered quality management of PCC based on the Building information modelling (BIM) technique as a key factor to achieving desired tolerances, combining the separated process, and decreasing errors. This study was conducted to modify BIM processes based on dimensionless indices of PCC. The Fuzzy-decision-making trial and evaluation laboratory (DEMATEL) method was used to obtain the weight of variables. Genetic expression programming (GEP) was then used to estimate the modified BIM index (IMBIM) in the PCC according to other important indicators as input data. The statistical results comparing the predicted and calculated values of IMBIM show that there is a low root-mean-square-error (RMSE) of 0.027, low MAE of 0.019, and high R2 of 0.95 in the testing process. Thus, there is good agreement between the relationship of IMBIM and the calculated values that the proposed algorithm in this study can predict IMBIM with high accuracy. The sensitivity analysis illustrates that the index of system quality (Isq) has the most significant effect on IMBIM in comparison with other indices.
引用
收藏
页数:11
相关论文
共 43 条
[1]   BIM in off-site manufacturing for buildings [J].
Abanda, F. H. ;
Tah, J. H. M. ;
Cheung, F. K. T. .
JOURNAL OF BUILDING ENGINEERING, 2017, 14 :89-102
[2]  
ACI (American Concrete Institute), 1993, ACI533R93
[3]  
ACI (American Concrete Institute), 2007, 31808 ACI
[4]  
ACI (American Concrete institute), 2009, SPEC TOL PREC CONCR
[5]   Design for occupational safety and health: A theoretical framework for organisational capability [J].
Adaku, Ebenezer ;
Ankrah, Nii A. ;
Ndekugri, Issaka E. .
SAFETY SCIENCE, 2021, 133
[6]   BIM benefits and its influence on the BIM implementation in Malaysia [J].
Al-Ashmori, Yasser Yahya ;
Othman, Idris ;
Rahmawati, Yani ;
Amran, Y. H. Mugahed ;
Sabah, S. H. Abo ;
Rafindadi, Aminu Darda'u ;
Mikic, Miljan .
AIN SHAMS ENGINEERING JOURNAL, 2020, 11 (04) :1013-1019
[7]   Progressive collapse assessment of precast prestressed reinforced concrete beams using applied element method [J].
Alanani, Magdy ;
Ehab, Mariam ;
Salem, Hamed .
CASE STUDIES IN CONSTRUCTION MATERIALS, 2020, 13
[8]  
[Anonymous], 1999, MANUAL QUALITY CONTR, V4th
[9]   Civil Engineering Quality Assessment in Terms of Construction Safety Index [J].
Baiburin, A. Kh. .
INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING (ICIE 2017), 2017, 206 :800-806
[10]   Estimation of Clear-Water Local Scour at Pile Groups Using Genetic Expression Programming and Multivariate Adaptive Regression Splines [J].
Bateni, S. M. ;
Vosoughifar, H. R. ;
Truce, B. ;
Jeng, D. S. .
JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2019, 145 (01)